Laserfiche WebLink
Culvert 148 <br />Time of Concentration (SCS) <br />Curve Number: 62 <br />Length of Flow: 2441.67 ft <br />Average Land Slope: 2.12 % <br />Time of Concentration: 1.222 hrs, 73.3 mins <br />Graphical Peak Discharge <br />Project: New Horizon Mine By: JSS <br />Location: C148 Checked: <br />1. Data: <br />Tue Mar 15 13:56:49 2016 <br />Date: 03/15/16 <br />Date: <br />Drainage area: .................... A = 46.8719Acres <br />Runoff Curve Number: ............. CN = 62 <br />Time of Concentration: ........... Tc = 1.22 <br />Storm Type: ....................... = II <br />Pond and swamp areas spread <br />throughout watershed ............... = 0.00 percent of A <br />0.0000 Acres <br />2. Frequency ........................yr = 25 <br />3. Rainfall,P(24-hour).............. in = 2.40 <br />4. Initial abstraction, Ia............ = 1.2258 <br />5. Compute la/P....................... = 0.5108 <br />6. Unit peak discharge, qu...... csm/in = 145.94 <br />7. Runoff,Q.........................in = 0.1888 <br />8. Pond & swap adjustment factor .... Fp = 1.00 <br />9. Peak Discharge,gp...............cfs = 2.0178 <br />Culvert 150 <br />This 24" CMP carries flow from the Morgan property under BB Road to Enstrom Draw. The <br />design for this culvert is located in Attachment 2.05.3(3)-27. <br />Culvert 155 <br />These 2 - 6" HDPE pipes are temporary and will be removed after construction of Pond 016. <br />These pipes convey flow from the Tailwater Ditch which will be routed to Pond 016 after it is <br />constructed. The watershed area for the Tailwater Ditch has been modeled in the Pond 016 <br />design which is included in Attachment 2.05.3(3)-29. <br />Attachment 2.05.3(3)-1 Page 54 June 2016 (TR -73) <br />