My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-24_PERMIT FILE - C1981008A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2016-08-24_PERMIT FILE - C1981008A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 7:11:34 AM
Creation date
10/6/2016 10:28:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
8/24/2016
Doc Name
Collection/Diversion Ditches and Culverts Design Parameters
Section_Exhibit Name
Section 2.05.3(3) Attachment 2.05.3(3)-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*The runoff curve number is a weighted average since the watershed area consists of multiple land types and curve numbers <br />Attachment 2.05.3(3)-1 Page 39 June 2016 (TR -73) <br />Structure <br />Watershed <br />Area <br />(acres) <br />Runoff <br />Curve <br />No. <br />Design <br />Event <br />Peak <br />Flow <br />(cfs) <br />CMP <br />Diameter <br />(inches) <br />Design Culvert Comments <br />Flow Length <br />(cfs) (feet) <br />C130 <br />42.7 <br />62 <br />10 yr -24 hr <br />1.1 <br />36 <br />50.0 40 Carries peak flow from Ditch D108 under 5 Street <br />C131 <br />0.1 <br />85 <br />25 yr -24 hr <br />0.2 <br />36 <br />50.0 40 Crossing along south side of 5 Street for property access <br />C132 <br />0.8 <br />85 <br />25 yr -24 hr <br />1.1 <br />12 <br />4.2 20 Crossing along south side of 5 Street for property access <br />C133 <br />1.4 <br />85 <br />25 yr -24 hr <br />1.8 <br />12 <br />4.2 20 Crossing along south side of 5 Street for property access <br />C 134 <br />9.3 <br />73 <br />25 -24 hr <br />2.7 <br />18 <br />11.2 20 Crossing along 5 Street in Ditch C 19 for property access <br />C135 <br />74.9 <br />73 <br />10 -24 hr <br />10.8 <br />18 <br />11.2 20 Crossing installed by landowner across Pond 007 inlet ditch <br />C136 <br />32.3 <br />73 <br />10 -24 hr <br />7.0 <br />3 x 18 <br />33.6 20 Carries peak flow from Ditch C17 into Pond 007 <br />C137 <br />132.7 <br />69.5* <br />10 yr -24 hr <br />11.0 <br />18 <br />11.2 14 Crossing installed by landowner across Pond 007 inlet ditch <br />C138 <br />42.7 <br />62 <br />25 -24 hr <br />2.4 <br />18 <br />11.2 Carries peak flow from Ditch D108 under 5 Street <br />C139 <br />4.7 <br />73 <br />25 -24 hr <br />2.4 <br />18 <br />11.2 44 Carries flow from upper portion of Ditch C20 under 5 Street <br />C140 <br />N/A <br />N/A <br />N/A <br />N/A <br />2 x 4 <br />N/A 45 HDPE pipe inlet into Pond 009 to prevent erosion on slopes <br />C141 <br />Pond 009 <br />- <br />- <br />- <br />10 <br />- 60 Carries peak flow from Ditches C15and C23 into Pond 009. <br />See Attachment 2.05.3(3)-30 for design. <br />C142 <br />Pond 009 <br />- <br />- <br />- <br />6 <br />- 440 Carries peak flow from IP Tailwater Ditch 2 to Ditch Cl. See <br />Attachment 2.05.3(3)-30 for design. <br />C143 <br />Pond 009 <br />- <br />- <br />- <br />4 <br />- 260 Carries peak flow from IP Tailwater Ditch 1 to Ditch C1. See <br />Attachment 2.05.3(3)-30 for design. <br />C144 <br />0.7 <br />85 <br />25 yr -24 hr <br />0.8 <br />12 <br />4.2 20 Crossing along BB Road in road ditch for property access <br />C145 <br />1.6 <br />85 <br />25 yr -24 hr <br />1.9 <br />12 <br />4.2 20 Crossing along BB Road in road ditch for property access <br />C146 <br />43.1 <br />62 <br />25 yr -24 hr <br />2.2 <br />12 <br />4.2 20 Crossing along BB Road in road ditch for property access <br />C147 <br />BB Road <br />West of 2700 <br />- <br />- <br />- <br />24 <br />- 60 Carries flow from Morgan property under BB Road to Enstrom <br />Draw. See Attachment 2.05.3(3)-27 for design. <br />C148 <br />46.9 <br />62 <br />25 -24 hr <br />2.0 <br />12 <br />4.2 60 Carries flow from outside permit under old Enstrom Bypass <br />C150 <br />BB Road <br />West of 2700 <br />- <br />- <br />- <br />24 <br />- 60 Carries flow from Morgan property under BB Road to Enstrom <br />Draw. See Attachment 2.05.3(3)-27 for design <br />C151 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A N/A Removed <br />C152 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A N/A Removed <br />C153 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A N/A Removed <br />C154 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A N/A Removed <br />C155 <br />Tailwater <br />Ditch <br />- <br />- <br />- <br />2 x 6 <br />- 400 HDPE pipes will be removed and flow from Tailwater Ditch <br />will be routed to Pond 016 after it is constructed. <br />*The runoff curve number is a weighted average since the watershed area consists of multiple land types and curve numbers <br />Attachment 2.05.3(3)-1 Page 39 June 2016 (TR -73) <br />
The URL can be used to link to this page
Your browser does not support the video tag.