Laserfiche WebLink
1. Application for permit for Surface or Underground Mining Activities —Minimum Requirements <br />for Operation and Reclamation Plans (2.05). <br />2. Landowner Protection (2.05.3(v)). <br />3. Reclamation Plan (2.05.4), <br />a. Irrigation (2.05.4(2)(e)(v)). <br />4. Post Mining Land Use (2.05.5) <br />a. Surface Coal Mine Activities (2.05.5 (1)) <br />b. Protection of Hydrological Balance (2.05.5 (3)) <br />5. Mitigation of the Impacts of Mining Activites (2.05.6) <br />a. Protection of Hydrological Balance (2.05.6 (3)) <br />6. Hydrologic Balance (4.05) <br />What plan does the New Horizon Mine have in place for the landowner to continue to irrigate all lands <br />once the New Horizon Mine's responsibility is terminated in order for the land owner to continue to <br />irrigate all our lands without being burdened by "Economical Impacts" once the coal mine is off our <br />lands? <br />P.O. Box 587 <br />Nucla, CO 81424 <br />Trustee <br />Trust <br />