My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-04_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2016-10-04_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2016 2:02:47 PM
Creation date
10/4/2016 10:48:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
10/4/2016
Doc Name
Adequacy Review Response
From
Seneca Property, LLC
To
DRMS
Type & Sequence
TR82
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br />CURRENT HYDROLOGIC MONITORING PROGRAM, SENECA II -W <br />Surface Water <br />Monthly = Monthly sampling at NPDES sites consists of field parameters (flow, pH, <br />temperature, electrical conductivity) and parameters listed in the NPDES permit (Appendix 15-4). <br />Monthly monitoring at NPDES sites will be conducted during all months (winter monitoring <br />exemption may apply). <br />Semiannual = Water quality samples (analyzed according to the (A) Surface Water Long <br />Parameter List (Table 2) or the (B) Surface Water Short Parameter List (Table 2a)) are collected <br />during the key hydrologic events of spring snowmelt and summer baseflow. <br />Suspend = Monitoring at site will be discontinued until one year prior to final bond release; it <br />will then be monitored for entire suite of parameters. <br />TR -82 15-3a-4 Revised 9116 <br />Monitoring Frequency <br />Site Number <br />Discharge <br />Water Quality <br />Comments <br />(Computer ID) <br />SW-S2W-SG5 (WSDS) <br />Semiannual <br />Semiannual (A) <br />Dry Creek <br />anal <br />mid-Hubberson Gulch, Suspend <br />SW-S2W-SG9 (WSH9) <br />June/September <br />June/September (B) <br />upper Hubberson Gulch <br />SW-S2W-FG1 (WSHF1) <br />Monthly <br />Semiannual (Al <br />lower Hubberson Gulch <br />SW-S2W-FG4 (WSSF3) <br />Semiannual <br />Semiannual (A) <br />lower Sage Creek <br />NPDES 005 (NPDESS) <br />Monthly <br />Monthly <br />Monitor per NPDES permit <br />NPDES 006 (NPDES6) <br />Monthly <br />Monthly <br />Monitor per NPDES permit <br />NPDES 009 (NPDES9) <br />Monthly <br />Monthly <br />Monitor per NPDES permit <br />NPDES 015 (NPDESI5) <br />Monthly <br />Monthly <br />Monitor per NPDES permit <br />NPDES 016 (NPDESI6) <br />Monthly <br />Monthly <br />Monitor per NPDES permit <br />NPDES 017 (NPDESI7) <br />Monthly <br />Monthly <br />Monitor per NPDES permit <br />Monthly = Monthly sampling at NPDES sites consists of field parameters (flow, pH, <br />temperature, electrical conductivity) and parameters listed in the NPDES permit (Appendix 15-4). <br />Monthly monitoring at NPDES sites will be conducted during all months (winter monitoring <br />exemption may apply). <br />Semiannual = Water quality samples (analyzed according to the (A) Surface Water Long <br />Parameter List (Table 2) or the (B) Surface Water Short Parameter List (Table 2a)) are collected <br />during the key hydrologic events of spring snowmelt and summer baseflow. <br />Suspend = Monitoring at site will be discontinued until one year prior to final bond release; it <br />will then be monitored for entire suite of parameters. <br />TR -82 15-3a-4 Revised 9116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.