My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-29_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2016-09-29_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 4:11:55 PM
Creation date
10/3/2016 9:06:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
HYDROLOGY
Doc Date
9/29/2016
Doc Name
3rd Quarter Groundwater Sampling
From
Golder Associates
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� 94 1172 0 3*9 <br /> RECEIVED <br /> SEP 2 9 2016 <br /> Golder ,OF <br /> Associates <br /> September 27, 2016 Project No. 1547675 <br /> Mr. Eric Scott <br /> Colorado Division of Reclamation Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver, Colorado 80203 <br /> RE: // THIRD QUARTER 2016 GROUNDWATER SAMPLING AT THE BOETTCHER QUARRY <br /> Dear Mr. Scott: <br /> On behalf of Holcim (US) Inc., Golder Associates Inc. is pleased to submit analytical laboratory results for <br /> the third quarter 2016 groundwater sampling event at the Boettcher Limestone Quarry near La Porte, <br /> Colorado. Attached are tables summarizing the results and a copy of the laboratory report. In addition to <br /> sampling wells MW-1 through MW-7, a field duplicate at MW-3 (MW-20) and a field blank (MW-15) were <br /> collected. The locations of monitoring wells MW-1 through MW-7 are presented in Figure 1. <br /> If you have any questions, please do not hesitate to call the undersigned at(303) 980-0540. <br /> Sincerely, <br /> GOLDER ASSOCIATES INC. <br /> Sara Harkins, P.G. Randy March, P.E., P.G. <br /> Geologist Principal Geological Engineer <br /> Attachments: <br /> Table 1: Summary of Monitoring Results for MW-1 <br /> Table 2: Summary of Monitoring Results for MW-2 <br /> Table 3: Summary of Monitoring Results for MW-3 <br /> Table 4: Summary of Monitoring Results for MW-4 <br /> Table 5: Summary of Monitoring Results for MW-5 <br /> Table 6: Summary of Monitoring Results for MW-6 <br /> Table 7: Summary of Monitoring Results for MW-7 <br /> Figure 1: Location Map <br /> Attachment A: ACZ Laboratory Report <br /> i\15\1547675\0110\3rdg2016 gw sampling-boettcher_fnl-27sep16\1547675 boettcherguarrygwsamp 3g2016_fnl-27sep16 docx <br /> Golder Associates Inc. <br /> 44 Union Boulevard,Suite 300 t1 <br /> Lakewood,CO 80228 USA <br /> Tel (303)980-0540 Fax (303)985-2080 www golder com <br /> Golder Associates:Operations in Africa,Asia,Australasia,Europe,North America and South America <br /> Golder,Golder Associates and the GA globe design are trademarks of Golder Associates Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.