Laserfiche WebLink
Page 1 of 1 <br />TABLE 1 <br />BOWIE NO. 1 MINE <br />SURFACE WATER MONITORING - STREAMS <br />STATION <br />PRESENTLY <br />PERMIT <br />v FIELD <br />WATER <br />MONITORED DRAINAGE <br />WATERSHED <br />FLUME I <br />INSTALLATION <br />NOTES <br />NO, <br />MONITORED? <br />ACTION <br />FLOW cfs PARAMETERS <br />QUALITY <br />BASIN <br />AREA <br />STREAM GAUGE TYPE <br />SIZE <br />DATE <br />Data recorder activated is 09/27/82. <br />SW -1 <br />NO <br />NONE <br />- - - - <br />- - <br />WEST FORK TERROR CREEK <br />18.44 sq.ml. <br />Stilling well and recorder <br />- - <br />Sep -82 <br />Well and recorder attached to <br />existing culvert. <br />SW -2 <br />NO <br />NONE <br />- - - - <br />- - <br />EAST FORK TERROR CREEK <br />5.94 sq.ml. <br />Parshall flume and recorder <br />4' x 30" <br />Sep -82 <br />SW -4 <br />NO <br />NONE <br />• - • - <br />TRIBUTARY TO WEST FORK TERROR <br />1.0 sq.ml. <br />Crest stage gauge <br />- - <br />Sep -82 <br />CREEK <br />SW -5 <br />YES <br />NONE <br />Quarterly Quarterly <br />Quarterly <br />STEVENS GULCH <br />4.01 sq.ml. <br />Parshall flume and recorder <br />3'x 30" <br />Sep -82 <br />SW -6 <br />YES <br />NONE <br />Quarterly Quarterly <br />Quarterly <br />EAST ROATCAP CREEK - <br />3.59 sq.ml. <br />Parshall flume and recorder <br />3'x 30" <br />Sep -82 <br />DOWNSTREAM <br />SW -7 <br />NO <br />NONE <br />- - - - <br />_ _ <br />TRIBUTARY TO FIRE MOUNTAIN <br />0.72 sq.ml. <br />Crest stage gauge <br />-- <br />Sep -82 <br />CANAL <br />SW - 8 <br />NO <br />NONE <br />• - - - <br />- - <br />COAL GULCH <br />0.80 sq. ml. <br />Crest stage gauge <br />- - <br />Sep -82 <br />SW - 9 <br />NO <br />NONE <br />- - - - <br />• - <br />WEST ROATCAP CREEK - UPSTREAM <br />- - <br />Parshall flume and recorder <br />1' x 30" <br />Nov -88 <br />Relocated to West Roatcap. Located <br />in East Roatca 07/83 trough 1986. <br />SW - 10 <br />NO <br />NONE <br />Quarterly Quarterly <br />Quarterly <br />TERROR DITCH <br />- - <br />Parshall flume and recorder <br />2.5' x 30" <br />Jul -83 <br />Stilling well and recorder attached to <br />SW - 11 <br />NO <br />NONE <br />• - - - <br />- - <br />MAIN ROATCAP CREEK <br />? <br />Concrete weir and recorder <br />• - <br />Jun -83 <br />weir <br />SW - 12 <br />NO <br />NONE <br />- - - - <br />-- <br />ROBERTS/STUCKER DITCH <br />• - <br />Parshall flume and recorder <br />2' x 30" <br />Jun -83 <br />Sampling initiated during West Mine <br />UERC <br />NO <br />NONE <br />- - • - <br />- - <br />EAST ROATCAP - ABOVE WEST MINE <br />? <br />Grab sample point <br />- - <br />Nov -86 <br />construction for TSS, TDS. <br />Sampling initiated during West Mine <br />LERC <br />NO <br />NONE <br />- - - - <br />- - <br />EAST ROATCAP -ABOVE WEST MINE <br />7 <br />Grab sample point <br />- - <br />Nov -86 <br />construction for TSS, TDS. <br />NOTES: 1) First quarter and monthly monitoring shall be initiated when sites are accessible. Second quarter and monthly monitoring shall be initiated by no later than May 15 of each year unless the Division is consulted <br />SW -1 Transferred to the Bowie No. 2 Mine Permit <br />Surface Water Tab <br />TR -61 Volume 4 Revised 07/2016 <br />