My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-01_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2016-09-01_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 7:33:20 AM
Creation date
10/3/2016 7:31:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
9/1/2016
Doc Name
page 100 to 164
Section_Exhibit Name
Volume 1 2.05 Operation and Reclamation Plans Part 3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND <br />MINING ACTIVITIES -- MINIMUM REQUIREMENTS FOR OPERATION <br />AND RECLAMATION PLANS. <br />2.05.6 Mitigation of Surface Coal Mining Operation Impacts. (Cont'd.) <br />(3) (b) (iii) (Cont'd.) <br />The operator believes that periodic reevaluation of the groundwater monitoring <br />program is necessary and will report to the Division monitoring results and projected <br />changes to the monitoring program in the "Annual Hydrology, Subsidence, and Mine <br />Inflow Report". The "Annual Hydrology, Subsidence, and Mine Inflow Report" will be <br />submitted to the Division by April 30 of each year. Groundwater monitoring <br />specified in Tables 3 and 4B of Volume 4 will continue until cessation of operations <br />and/or approval of the Division. <br />Post Reclamation Monitoring <br />When regrading and backfilling of the east mine site is complete, nine piezometers <br />were to be installed in the backfilled wedges to monitor groundwater saturation. The <br />piezometers were to be installed where shown on Map 6A -5D. One piezometer was <br />to be located in the fill wedge above the crushing and screening level. Two <br />piezometers were to be located in the fill wedge above the shop level. One <br />piezometer was to be located in the fill wedge above the parking level and two <br />piezometers were to be located in the fill wedge above the office level. Three <br />piezometers were to be located in the fill wedge above the fan level. The <br />piezometers were to be installed throughout the entire thickness of the fill wedges. <br />The piezometers were to be monitored quarterly through the first two years following <br />backfilling and annually in June thereafter for the duration of the reclamation liability <br />period or until cessation of monitoring is approved by the Division. A typical <br />piezometer well completion diagram is presented in Volume 6A, the Phase II Study, <br />Geo-Hyro Consulting, Plate 6. <br />During the reclamation of the site there was not any indication of springs or other <br />water sources that would cause saturation of any of the fill wedges. Additionally, the <br />existing monitoring wells on site (B-5, B-6, B-8) have been dry during all monitoring <br />events. Therefore the nine piezometers mentioned above were not installed. <br />TR 61 124 Revised 08/31/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.