Laserfiche WebLink
IVERSON MINE <br /> NOT TO SCALE <br /> O 1 <br /> BACKFILLED, PER S <br /> .wpw <br /> REQUIREMENT CONVEYOR AND <br /> RIVER BREACH 05 25 144~ ! RAILROAD CROSSING <br /> CACHE LA POUDRE FLOOD m �` - TUNNEL REMOVED <br /> REPAIRED AND HELD DURING <br /> 2015 AND 2016 -- <br /> v. <br /> RIVER BREACH 05-12-15 <br /> WASHED OUT SPILLWAY DUE TO <br /> •a <br /> NO VEGETATION ESTABLISHED <br /> YET IN SPILLWAYS. RE- <br /> CONSTRUCTED AND VEGETATED. : ". <br /> HELD DURING THE 2016 RUN <br /> OFF. <br /> NOTE: ALL MINING AND SPILLWAYS <br /> COMPLETED. DESIGN FOR TOP <br /> GRADING TO BE COMPLETED EARLY <br /> 2017. STILL NEED TOP GRADING AND <br /> SEEDING IN 2017. <br /> ECE�vE® Report <br /> 2016 Annual Re <br /> R p <br /> SEP NAB DRMS M-2011-001 <br /> pNIS10N OF& AFETY ION <br /> FIIINWG S5l��//!�� <br />