My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M2016010 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
_PERMIT FILE - M2016010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2020 4:05:29 PM
Creation date
9/30/2016 12:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Name
Adequacy Review Response #3
From
Transit Mix Concrete Co.
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hitch Rack Ranch Phase III Surety Calculation Details <br /> Project: Hitch Rack Ranch <br /> Date: 07/05/16 <br /> Prepared by: Norwest Corporation <br /> PRODUCTIVITY AND HOURS REQUIRED FOR LOADER USE <br /> Earthmoving Activity: <br /> Drainages and Ponds. <br /> Approximately 250,862 Icy of material to be loaded for hauling. <br /> Characterization of Loader Use (type, size, etc.): <br /> Cat 992 Wheeled Loader w/16 yd3 bucket <br /> Description of Loader Use (origin, destination, grade, haul distance, etc.): <br /> Assume average truck loading cycle time=0.60 minutes, heaped bucket capacity of 16 LCY,95%fill <br /> factor,and 83%efficiency factor. <br /> Hourly Production= 1,081 LCY/hr @ 250,862 LCY=232 Hours <br /> Productivity Calculations: <br /> Cycle Time= min + min + 0.6 min = min <br /> haul time(loaded) return time (empty) basic cycle time <br /> Net Bucket Capacity= 16 LCY x 0.95 = _ LCY <br /> heaped bucket capacity bucket fill factor* <br /> Hourly Production = `T LCY / min x 0.83 x min/hr <br /> net bucket capacity cycle time efficiency factor <br /> 1081 LCY/hr <br /> Hours Required = 38,6961 LCY / LCY/hr = _-_ hr <br /> volume to be moved hourly production <br /> *See loader section of equipment manual. <br /> Data Source(s):CAT Handbook Edition 43 <br /> Printed 9/26/2016 APPENDIX L-1 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.