Laserfiche WebLink
Hitch Rack Ranch Phase III Surety Calculation Details <br /> Hourly Hourly Hourly Number Total Equip. + <br /> Equipment Operating Ownership Labor Hourly of Men Eq. & Lab. Production Labor <br /> Cost Costs Costs w/Add Ons Cost or E . Costs Units Quantit Units Rate Units Time/Dis. Units Cost <br /> DRAINAGES, PONDS, and <br /> CULVERTS <br /> CAT D10 574 HP 91.48 79.35 37.50 208.33 1 208.33 $/HR 241,698 LCY 1 896 LCY/HR 269.63 HR $56,172.40 <br /> CAT 777 (1050HP) 111.19 45.64 37.50 194.33 3 582.99 $/HR 241,698 LCY 1084 LCY/HR 223.07 HR $130,048.47 <br /> CAT992 801HP 172.54 124.95 37.50 334.99 1 334.99 $/HR 241,698 LCY 1081 LCY/HR 223.51 HR $74,873.82 <br /> CAT 16M 297HP 76.38 55.64 37.5 169.52 1 169.52 $/HR 111.54 HR $18,907.54 <br /> Water Truck 10,000 Gal - 777 204.97 148.7 37.5 245.5 1 245.50 $/HR 223.51 HR $54,871.86 <br /> Subtotal <br /> $334,874.09 <br /> Source <br /> Mine and Mill Equipment Costs 2015 <br /> Printed 9/26/2016 APPENDIX L-1 17 <br />