My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M2016010 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
_PERMIT FILE - M2016010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2020 4:05:29 PM
Creation date
9/30/2016 12:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Name
Adequacy Review Response #3
From
Transit Mix Concrete Co.
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hitch Rack Ranch Phase III Surety Calculation Details <br /> Hourly Hourly Hourly Number Total Equip. + <br /> Equipment Operating Ownership Labor Hourly of Men Eq. & Lab. Production Labor <br /> Cost Costs Costs w/Add Ons Cost or Eq. Costs Units Quantit Units Rate Units Time/Dis. Units Cost <br /> Highwall <br /> CAT D10 574 HP 91.48 79.35 37.50 1 208.33 1 208.33 $/HR 26,539 LCY 1 1046 LCY/HR 1 25.38 HR $5,286.80 <br /> CAT 777 1000HP 204.97 148.7 37.5 245.5 1 245.50 $/HR 26,539 LCY 1084 LCY/HR 24.49 HR $6,013.30 <br /> CAT 992 (801 HP) 213.41 116.3 37.5 367.21 1 367.21 $/HR 26,539 LCY 1081 LCY/HR 24.54 HR $9,012.18 <br /> CAT 16M 297HP 76.38 55.64 37.5 169.52 1 169.52 $/HR 12.25 HR $2,076.12 <br /> Water Truck 10,000 Gal - 777 204.97 148.7 37.5 245.5 1 245.50 $/HR 12.25 HR $3,006.65 <br /> Subtotal $25,395.04 <br /> Mine and Mill Equipment Costs 2015 <br /> Printed 9/26/2016 APPENDIX L-1 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.