Hitch Rack Ranch Phase III Surety Calculation Details
<br /> Means Concrete
<br /> Crew Daily Unit Disposal
<br /> Location Description/Materials Reference Type Output Cost Unit Length Width Height Diam Area Volume Pad Concrete Volume Weight Quantity Unit Cost
<br /> Number Area Wall Area
<br /> DEMOLITION SUMMARY
<br /> Structure's Demolition Cost
<br /> 1 Scale House/Office -(mixed) [8" pad] 02 41 1613 0100 B8 20100 0.31 /CF 24 60 10 1,440 14,400 1,440 80 18 1 CF $ 4,464
<br /> 2 Septic Tank/Vault Concrete 8"walls, floor, to 02 41 1613 0050 B8 15300 0.41 /CF 12 12 8 144 1,152 1 CF $ 472
<br /> 3 Non-Potable Water Tank/Cistern 5,000gallon) 8"walls, floor, to 02 41 1613 0050 B8 15300 0.41 /CF 12 12 6 144 864 1 CF $ 354
<br /> 4 Truck Scale 8"foundation 02 41 1613 0020 B8 21500 0.29 /CF 70 11 3 770 2,310 770 1 CF $ 670
<br /> 5 Central Substation - concrete pads' 8'' ads 50 50 10 2,500 1 1,000
<br /> 6 Warehouse/Truck Shop- steel 8" pad, footer walls 02 41 1613 0020 21500 0.29 /CF 801 100 301 8,0001 240,000 8,000 1,080 1411 26 1 CF 1 $ 69,600
<br /> 6a Drum Storage Pad ' 8" ad 15 15 0.5 1,256 0 1,256 90
<br /> 7 Fuel Island 8"concrete Containment with fueling pad]* 60 20 1,200 3,395 400
<br /> 7a Diesel Storage Tank 15,000 al - steel 13 05 0575 0540 B34S 3,725 EA 1 EA $ 3,725
<br /> 7b Gasoline Storage Tank 1,000 al -steel 13 05 0575 0520 B34P 2,019 EA _ 1 EA $ 2,019
<br /> 8 15,000 gallon Water Tank- steel 8" ad 13 05 0575 0540 B34S 2,750 EA 12 113 113 1 EA $ 2,750
<br /> 9 Main Stockpile Surge Tunnel concrete 8"walls, top amd floor 0241 1613 0050 B8 15300 0.41 /CF 1301 12 81 1,5601 12,480 3,120 2,176 1 CF $ 5,117
<br /> 10 Base Screening Tower(open Steel 70%cost 24" ad 0241 1613 0020 B8 21500 0.20 /CF 20 6 20 120 2,400 120 6 1 1 CF $ 487
<br /> 11 Primary Jaw Crusher/Truck Dump metal 24" ad 0241 1613 0020 B8 21500 0.29 /CF 74 24 25 1,776 44,400 1,776 1,720 22 4 1 CF $ 12,876
<br /> 12 Scalper Screen (open steel 70% Cost 24" ad 0241 1613 0020 B8 21500 0.20 /CF 20 6 12 120 1,440 120 4 1 1 CF $ 292
<br /> 13 Plant Control and Utility metal 24" ad 0241 1613 0020 B8 21500 0.29 /CF 48 24 30 1,152 34,560 1,152 576 456 28 1 CF $ 10,022
<br /> 14 3 Deck Inclined Screen Tower(open steel 70% cost 24" ad 0241 1613 0020 1138 21500 0.20 /CF 20 81 20 160 3,200 1601 12 2 2 LF $ 1,299
<br /> 15 Cone Crusher(open steel 70% cost 24" ad 0241 1613 0020 1138 1 215001 0.20 /CF 16 18 201 3,619 2011 14 3 2 CF $ 1,469
<br /> Conveyors
<br /> 16 CV1 -Jaw Crusher to Base Screening Tower 42" elevated 70 20
<br /> 17 CV2 - Screening Tower to Main Stockpile 42" elevated 155 30
<br /> 18 CV3- Surge Tunnel Reclaim Belt 42" on round 140
<br /> 19 CV4a - Screen Feed 42" 40' o , 162' elv 200
<br /> 20 CV4 Chute Steel 24" ad 02 41 1613 0020 B8 21500 0.29 /CF 14 14 12 196 2,352 196 10 2 1 CF $ 682
<br /> 21 CV4b- Screen Feed 42" 40' o , 162' elv 200
<br /> 22 CV4c- 57/67 Feed Interconnect 36" elevated 30
<br /> 23 CV5a- Screen Feed Undersize 36" 0 30
<br /> 24 CV5b- Screen Feed Undersize 36" 0 30
<br /> 25 CV5c- Screen Feed Undersize 36" 0 30
<br /> 26 CV6- Fines stockpile stacker elevated 100
<br /> 27 CV7a -Asphalt Rock Stockpile on round 100
<br /> 28 CV7b-Asphalt Rock Stockpile elevated 120
<br /> 29 CV8a- 57/67 Stockpile on round 120
<br /> 30 CV8c- 57/67 Radial Stacker elevated 150
<br /> 31 CV9c-Cone Crusher Return 3 36" on round 50
<br /> 32 CV9d - Cone Crusher Return 4 36" 75'o . 175' elv 250
<br /> 33 CV10- Base Screen Stockpile 42" on round 80
<br /> 34 CV10b- Base Screen Stockpile Stacker 36" elv 50
<br /> 35 CV11 - Base Screen Fines 36" (30 0 . 50'elv) 80
<br /> Conveyor Summary
<br /> 42" Conveyor Elevated 24"footers 02 41 1613 0020 B8 21500 0.29 /CF 549 7.5 15 4,118 61,763 220 185 34 1 CF $ 17,911
<br /> 42" Conveyor Non-elevated 24''footers 0241 1613 0020 B8 21500 0.29 /CF 220 5 5 1,100 5,500 110 56 10 1 CF $ 1,595
<br /> 36" Conveyor Elevated 24''footers 0241 1613 0020 B8 21500 0.29 /CF 675 7 15 4,725 70,875 270 204 37 1 CF $ 20,554
<br /> 36" Conveyor Non-elevated 24"footers 0241 1613 0020 B8 21500 0.29 /CF 575 4 5 2,300 11,500 230 127 23 1 CF $ 3,335
<br /> Concrete Demolition
<br /> Concrete Slab 6"w/Ave Reinforcing 0241 1617 0420 B13L 4000 0.94 /SF
<br /> Concrete Slab 8"w/Ave Reinforcing ads included 10241 1617 2420 813L 3500 0.95 /SF 19,094 1 SF $ 18,139
<br /> Concrete Slab 24"w/Ave Reinforcing 10241 1617 2500 B13L 1250 2.20 /SF 4,916 1 SF $ 10,815
<br /> Wing Wall-Foundation Walls Concrete 10241 1617 2420 B13L 3500 0.95 /SF 6,042 1 SF $ 5,740
<br /> Printed 9/26/2016 APPENDIX L-1 2
<br />
|