.t <br /> �, o Transit Mix Concrete Co. <br /> The volume of material that will be moved by bulldozing was determined by calculating the Phase <br /> III cut/fill volumes to regrade the existing fines stockpile (F1). <br /> The dozer will be used for regrading/recontouring and assist with growth media replacement. The <br /> loader and haul trucks will be used for moving material and berm construction. <br /> Calculations were generated following DMRS-provided worksheet formats and numbering system <br /> to include general earthwork consisting of grading to achieve stable and free draining slopes, <br /> ripping of compacted areas and placement of salvaged topsoil. All slopes will be regraded to <br /> achieve slope angle of 3H:1V or less steep. Only the pit highwalls will remain at an overall slope <br /> of 1 H:1 V, and no other slopes are steeper than 3H:1 V. <br /> Surety Bond Calculations <br /> The surety bond calculations for the Phase III stage of Hitch Rack Ranch include details for each <br /> part of the reclamation cost is shown in Appendix L1. The details developed in the surety bond <br /> calculations are provided. <br /> • Bond Total <br /> • Demolition Summary <br /> o Demolition Crews and Equipment <br /> • Earthwork Summary <br /> o Earthwork Highwall Bench <br /> o Earthwork Stockpiles <br /> o Earthwork Pits, Roads, Facilities <br /> o Earthwork Drainages <br /> o Earthwork Vegetative Media <br /> o Equipment Productivity Worksheets <br /> • Revegetation Summary <br /> Bond Total <br /> The Bond Total sheet calculates the surety bond amount summarizing the direct costs, adding <br /> 23.5% of indirect costs, projects escalation at 1.9%to arrive at an escalated reclamation cost total <br /> as the bonding amount. <br /> Demolition Summary <br /> The demolition summary worksheet (pages 2-3) provides a location number for each planned <br /> structure that corresponds to Figures L-1 and L-2. The description /materials portion of the <br /> worksheet describes the structure, type of material, and the concrete pad thickness. The <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> September 26, 2016 L-5 <br />