Laserfiche WebLink
Natural Soda LLC <br /> Drilling and Coring Program <br /> Well Completion Information <br /> Well Name: 151-1-11 <br /> Hole Type: Directional Rotary-Horizontal <br /> Well Type: Horizontal Recovery Well <br /> Well Status: Active <br /> Intermediate Hole Drilling Operation, Primary Intermediate Hole Plug Back Data <br /> Hole Diameter, in: 9.500 Date&Time: 8/17/16 23:15 <br /> Start Depth,ft: 1318.1 Start Depth,ft: 1636.1 <br /> End Depth,ft: 1918.1 End Depth,ft: 1918.1 <br /> Total Footage: 600.0 Materials: Displaced 17.6 bbls of 15.8 ppp cement with 24 2 bbls wbm <br /> Start Date&Time: 8/16/16 21:15 <br /> End Date&Time: 8/17/16 17:20 <br /> Total Drilling Hours: 20.1 Intermediate Casing Data <br /> Drilling Contractor: Capstar Casing Depth,ft: 2264.1 <br /> Rig Number: 316 Casing Diameter, in: 7 OD; 6.366 ID <br /> Drilling Media: WBM Casing Type: J-55 LTC 8RD <br /> Comments:KOP:1301.1 MD GL; LC plug 1636.1-1918.1 MD GL, Casing Wt: 23 lb/ft <br /> hole sidetracked,see secondary drill data <br /> Install Date&Time: 8/20/16 4:25 <br /> Comments: hanger set at 1128.1 MD GL <br /> Intermediate Hole Drilling Operation, Secondary Intermediate Casing Cement Data <br /> Hole Diameter, in: 9.500 Primary Secondary <br /> Start Depth,ft: 1636.1 Date: 8/20/2016 nd <br /> End Depth,ft: 2265.1 *Interval,ft: 1288-2265 1 nd-nd <br /> Total Footage: 629.0 Type: not specified nd <br /> Start Date&Time: 8/18/16 5:25 Additives: notspecrfied nd <br /> End Date&Time: 8/19/16 7:25 Amount,sks: 191 nd <br /> Total Drilling Hours: 26.0 Weight,lb/gal: 125 nd <br /> Drilling Contractor: Capstar Method: Displacement nd <br /> Rig Number: 316 Comments: aquffm isolation mhmved <br /> Drilling Media: WBM <br /> Comments: sidetracked intermediate hole KOP:1636.1 MD GL <br /> Drillout Operation Open Hole Interval <br /> Hole Diameter,in: 6.125 Hole Diameter, in: 6.125 <br /> Start Depth,ft: 2265.1 Top Depth,ft: 2265.1 <br /> End Depth,ft: 2698.1 Bottom Depth(TD),ft: 2698.1 <br /> Total Footage: 433.0 Interval Thickness,ft: 433.0 <br /> Start Date&Time: 8/21/16 18:00 Comments: 15H-R connected to 15H-I ST at 13:00 on 8/22/16 <br /> End Date&Time: 8/22/16 12:40 <br /> Total Drilling Hours: 18.7 <br /> Drilling Contractor: Capstar Production Casing Data <br /> Rig Number: 316 Casing Top Depth,ft: nd <br /> Drilling Media: Brine Csg Bottom Depth,ft: nd <br /> Comments- float collar at 2217 MD GL Casing Diameter,in: nd OD; nd ID <br /> Casing Type: nd <br /> Casing Wt: nd <br /> Install Date&Time: nd <br /> Comments: <br /> Daub&Associates,Inc <br /> Printed 9/16/2016 Page 2 of 3 Daub MASTER NS Database 8-26-16 <br />