Laserfiche WebLink
INSPECTION REPORT - WEST PIT FILL <br />INDICATE QUARTER 1sT ❑ 2ND ❑ 3RD X 4T" ❑ 2016 <br />YEAR <br />�t ALL QUARTERS NEED TO BE CERTIFIED �F <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No X Yes <br />If yes, explain: <br />Date of Survey: 9-20-16 by Kendal Bergman & Mike Fraher <br />Reviewed By: Lee Sampson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 82.8 ft. <br />If yes, explain: <br />Date of Measurement: 9-19-16 <br />Measured By: Lee Sampson, Kurt Blunt <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 9-19-16 <br />Inspected By: Lee Sampson, Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 9-19-16 <br />Inspected By: Lee Sampson, Kurt Blunt <br />Reference Permit - Volume 5-13, Exhibit 19, Page I a-4 <br />CF: HSEQ 24.20 Revised March 7, 2006 <br />