Laserfiche WebLink
Scraper Worksheet Cont'd Task#003 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Backfill overburden into <br /> Site: Church Pit Permit Action: 2016 Bond Calculation Permit/Job#: M1979045 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: __Colorado _ Abbreviation: None <br /> Date: 9/26/2016 County: Jefferson Filename: M045-003 <br /> User: MAC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 657G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA _ <br /> -Dump Area: Cat D9T-9SU <br /> --- -- ---------------------------- -- —----- -- <br /> Road Maintenance-Motor Grader: I NA <br /> -Water Truck: Water Tanker,3,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper T Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 �_- NA NA - — 100 _ NA 100 <br /> Ownership cost/hour: $167.61 NA j NA $97.48 NA $11.19 <br /> Operating - - -- - -- �� --- -- - — <br /> eratinQ cost/hour: $227.50 NA ��, NA $103.60 NA i $31.27 7 <br /> %Utilization-ripper: NA NA NA 1 NA NA NA <br /> Ripper own.cost/hour: NA NA NA $0.00 NA jl $0.00 <br /> Ripper op.cost/hour: NA NA NA $0.00 NA $0.00 <br /> Operator cost/hour: $41.06 NA NA $39.87 NA $0.00 <br /> Unit Subtotals: $436.17 NA NA $240.95 NA $42.46 <br /> Number of Units: 1 8 0 0 1 0 1 <br /> Group Subtotals Work: $3,489.36 -Support: $240.95 Maint: $42.46 <br /> Total work team cost/hour: $3,772.77 <br /> MATERIAL QUANTITIES <br /> Initial volume: 68,500 CCY Swell factor: 1.000 <br /> Loose volume: 68,500 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety _ <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 lbs/LCY Struck Volume: 32.00 LCY <br /> Material description: Decomposed rock-25%Rock, Heaped Volume: 44.00 LCY <br /> _75%Earth <br /> Rated Payload: 104,000 pounds Average Volume: 38.00 LCY <br /> Payload Capacity: 39.25 LCY Adjusted Capacity: 38.00 LCY <br /> CIRCES Cost Estimating Software <br />