Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#002 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade site <br /> Site: _Church Pit_ _— Permit Action: 2016 Bond Calculation Permit/Job#: M1979045 <br /> PROJECT IDENTIFICATION <br /> Task#: - 002 _ State: _Colorado _ Abbreviation: None _ <br /> Date: 9/26/2016 County: Jefferson Filename: M045-002 <br /> User: MAC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Deleted-Cat D9T-9U <br /> Horsepower: 405 <br /> Blade Type: Universal _ <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization <br /> Ownership Cost/Hour: $95.80 Nti <br /> Operating Cost/Hour: $111.0� 100 <br /> Ripper own. Cost/Hour: _ -- _$0.00 NA _ <br /> Ripper op. Cost/Hour: $0.00 T 0 <br /> Operator Cost/Hour: $39.87 NA <br /> Total unit Cost/Hour: $246.70 <br /> ----------------------- ---- <br /> Total Fleet Cost/Hour: $246.70 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 27,820 <br /> Swell factor: 1.000 <br /> Loose volume: 27,820 LCY <br /> Source of estimated volume: _Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 2,222.9 LCY/hr <br /> Materials consistency description: Loose stockpile 1.2- <br /> Average push gradient: 0% <br /> Average site altitude: 5,000 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Sand and gravel-Dry <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.200 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />