Laserfiche WebLink
DEMOLITION WORK <br /> Task description: Demo and removal of equipment <br /> Site: Church Pit Permit Action: 2016 Bond Calculation Permit/Job#: M 1979045 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: _Colorado Abbreviation: None _ <br /> Date: 9/26/2016 County: Jefferson_ _ Filename: M045-001 <br /> User: MAC <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adiustment: 101.20 % <br /> Structure or Item Demolition Menu Unit Total Cost <br /> Description Dimensions Selection Quantity Unit <br /> i_ __ I Cost _ <br /> Large 100'x 40'x Bldg. (SN)demo./on- 1 00,000.00 CF $0.18 $21,360.00 <br /> crusher/washing/processing 30' I site disposal in existing <br /> bldg pit or cut-Max.200 ft. <br /> push <br /> Floor for aforementioned 4000 sq ft Demo.and on-site 4,000.00 j SF $2.16 $8,632.00 <br /> bldg disposal in existing pit, I j <br /> 12 in.thick-Max.200 <br /> ft.push _ <br /> Crushers/screens/processing —62,000 cf Blg. (SN d )demo./on-_ 62,000.00_ _--�CF $0.19 $11,718.00 <br /> equipment site disposal in existing <br /> pit or cut-Max. 10,000 <br /> ft.haul <br /> �S�hds 2000 Bldg. (SN)demo./on- T2,000.00 CF $0.21 $410.00 <br /> site disposal in <br /> excavated pit-Max. <br /> 10,000 ft.haul _ <br /> Fixed Conveyors 5301f Conveyor,elevated, 530.00 LF $44.51� $23,589.77 <br /> including supports-5 <br /> ft.W x 6 ft.H housing <br /> Removal CY, , . 2.00 $3,998.00 <br /> equipment demolished <br /> materials/debris into pit <br /> -Max. 10,000 ft.haul <br /> Haul away 8 portable 160 cy Loading and 5 mile 160.00 CY $10.57 $1,691.20 <br /> conveyors and belts haul, salvage allowed- — ( — <br /> Steel frame structures <br /> Scale platform-concrete 1500 sq ft Demo. and on-site 1,500.00 SF $1.85 $2,775.00 <br /> portion disposal in existing pit, <br /> 10 in. thick-Max. <br /> _ 10,000 ft.haul <br /> Scale platform-steel 600 sq ft Demo. and on-site 600.00 SF $2.22 $1,332.00 <br /> portion disposal in existing pit, <br /> 12 in. thick-Max. <br /> _ 10,000 ft.haul <br /> Purge product from diesel 500 gal ea Remove sludge,water, 1.00 EA $231.0�— $231.00 <br /> fuel tanks x 2 and rem.product from <br /> tank-3,000 to 5,000 <br /> gal. <br /> Remove diesel fuel tanks 5x 0 g0 al ea Haul tank to certified 1.00 EA $760.00 $760.00 <br /> 2 salvage dump-3,000 to <br /> 5,000 gal. tank <br /> Remove propane tanks x 2 1000 gal ea Haul tank to certified 2.00 EA $760.00 $1,520. 00 <br /> salvage dump-3,000 to <br /> 5,000 gal.tank <br />