Laserfiche WebLink
Page 1 of 2 <br /> -EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Equipment Mobilization/Demobilization <br /> Site: Church Pit _ Permit Action: 2016 Bond Calculation Permit/Job#: M 1979045 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado _ Abbreviation: None _ <br /> Date: 9/26/2016 _ County: Jefferson Filename: M045-005 <br /> User: MAC <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4, DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons_ j 26-50 Tons j SI+Tons_ _ <br /> Ownership Cost/Hour: $16.63 $18.37 �_ $22.33 <br /> O ep rating Cost/Hour: 1 $44.38 $46.13 1 50.07 <br /> ______ Operator Cost/Hour: $27.66_ 1 $27.66 -__ T _ $27.66 _ <br /> Helper Cost/Hour: $0.00 $25.39 j $25.39 <br /> -- - - - - — <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship <br /> T Haul Rig Fleet THaul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost <br /> Cost/hr/fleet Cost/fleet <br /> (TONS)_____ t fleet <br /> CatD9T 9S_U__ % 60.01 _ $97.48 $125.45 - $222.93 $ 2 .45 $250.00 <br /> Cat657G 78.88 � 67.61 $125.45 I 8 1_$2,344.48 $1,003.60 $2,000.00 <br /> Subtotals: E_$2,567.41 _ $1,129.05 $2,250.00 <br /> ROADABLE EQUIPMENT: <br /> j Machine Description Total Cost/hr/Fleet Size Haul Trip Return Trip <br /> _ unit i Cost/hr/fleet Cost/hr/fleet <br /> Subtotals: F $0.00 $0.00 <br /> CIRCES Cost Estimating Software <br />