Laserfiche WebLink
emergency spillway can safely pass the runoff from the 100 year, 24 hour storm. This <br />information is also summarized in Exh. 7-23C, Table 1. <br />At the end of the mine's projected life, many of the reclaimed pit areas and spoil pile areas will <br />again become contributory to the downstream sediment control structures. This case is evaluated <br />separately in Part I of this document. <br />Exh. 7-23C-3 Revision Date: 11/09/15 <br />Revision No.: PR -04 <br />