Laserfiche WebLink
height, vertical distance between spillways, etc.) can be considered accurate. The input pond geometry <br />parameters are shown on the SEDCAD4 printouts and summarized in Table 5. <br />TABLE 5 <br />POND GEOMETRY <br />LCX -IN (SUMP) <br />LCX -DS POND <br />Roadside Impoundment <br />Elevation (ft) <br />Area <br />(ac) <br />Elevation (ft) <br />Area <br />(ac) <br />Elevation (ft) <br />Area <br />(ac) <br />6705 <br />1.22 <br />6621 <br />0.13 <br />7200 <br />1.19 <br />6710 <br />1.68 <br />6625 <br />0.16 <br />7205 <br />1.71 <br />6716 <br />2.28 <br />6630 <br />0.65 <br />7210 <br />2.33 <br />6720 <br />2.72 <br />6635 <br />1.21 <br />7215 <br />3.04 <br />6726 <br />3.42 <br />6640 <br />2.00 <br />7220 <br />3.83 <br />6730 <br />3.92 <br />6642 <br />2.61 <br />7225 <br />7.45 <br />6737 <br />4.91 <br />7230 <br />9.50 <br />7232 <br />10.77 <br />4.0 POND CLASSIFICATIONS AND SPILLWAY EVALUATIONS <br />The site is located in a rural, agricultural area and meets Class A criteria for dams in the U.S. Department <br />of Agriculture, Soil Conservation Service Technical Release No. 60 (210-VI-TR60, October, 1985). All <br />proposed structures will be either constructed below existing grade or will have an above -grade storage <br />volume of 20 acre-feet or less, with a dam height of 20 feet or less (measured from the upstream toe to the <br />emergency spillway crest) and are therefore exempt from Mine Safety and Health Administration <br />regulations under 30 CFR § 77.216. <br />The proposed above -grade structures will not be designed or operated for the purpose of impounding <br />water above the natural surface of the ground other than flood detention and are therefore exempt under <br />Rule 17 of the State of Colorado, Rules and Regulations for Dam Safety and Dam Construction. Design <br />for this impoundment is provide in Part C of Exhibit 7, Item 23. <br />The Little Collom (LCX-D/S) Pond facility will provide adequate capacity to contain or treat the runoff or <br />inflow entering the pond as a result of 10 -year, 24-hour precipitation event, provide a nonclogging <br />dewatering device or conduit spillway to remove water storage resulting from inflow, and an emergency <br />spillway design to safely pass the 25 -year, 24-hour precipitation event. The Little Collom Sump (LCX - <br />IN in -pit sump) facility will be operated as an enclosed sump within the Little Collom X pit, and pumped <br />into LCX -DS for polishing as water quality and pond drawdown allows. Design for this impoundment is <br />provide in Part B of Exhibit 7, Item 23. <br />The Roadside Impoundment is an intermittent impoundment formed by the large temporary spoil pile, <br />which will be emptied by pumping as necessary However, the runoff form a storm as large a 25 year <br />event only raises the pool 8.7 feet . Design for this impoundment is provide in Part G of Exhibit 7, Item <br />23. <br />5.0 RIPRAP SIZING <br />Unless specifica',ly stated otherwise, riprap sizes were determined using the SEDCAD 4.0 subroutine `or <br />designing riprap lined channels utilizing the OSM/Simons Method. SEDCAD also provides another <br />Exh. 7-23-6 Revision Date: 9/23/11 <br />Revision No.: PR -03 <br />