My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_PERMIT FILE - C1981019A (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2016-08-08_PERMIT FILE - C1981019A (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 12:54:04 PM
Creation date
9/28/2016 9:39:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
8/8/2016
Doc Name
Table of Contents & Intro
Section_Exhibit Name
Volume 18 Exhibit 7 Item 23
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part E, Sediment Control for Topsoil Stockpiles <br />Introductory Text, Topsoil Stockpiles......................................................................... Exh. 7-23E-1 <br />SEDCAD Results, Topsoil Stockpile Ring Ditch/Berm, 10 Year, 24 Hour Event ..... Exh. 7-23E-2 <br />SEDCAD Results, Topsoil Stockpile Ring Ditch/Berm, 10 Year, 24 Hour Event ..... Exh. 7-23E-3 <br />Part F, Geotechnical Investigations, Collom Sediment Ponds <br />IntroductoryText......................................................................................................... Exh. 7-23F-1 <br />Part G, Small Area Exemption <br />IntroductoryText.........................................................................................................Exh. 7-23G-1 <br />SEDCAD Results, Vegetative Filter 600 ft wide x 20 ft long.....................................Exh. 7-23G-4 <br />SEDCAD Results, Vegetative Filter 600 ft wide x 70 ft long...................................Exh. 7-23G-12 <br />SEDCAD Results, Vegetative Filter 1,200 ft wide x 70 ft long................................Exh. 7-23G-20 <br />Part H, Perimeter Area Sediment Control <br />IntroductoryText.........................................................................................................Exh. 7-231-1-1 <br />SEDCAD model for Generic Triangular Ditch, 10 Year, 24 Hour .............................Exh. 7-231-1-5 <br />SEDCAD model for Generic Trapezoidal Ditch, 10 Year, 24 Hour .........................Exh. 7-23H-11 <br />SEDCAD model for 100x100 area thru 20x100 grass filter, 10 Year, 24 Hour....... Exh. 7-231-1-17 <br />SEDCAD model for 100x1000 area thru 20x1000 grass filter, 10 Year, 24 Hour...Exh. 7-231-1-24 <br />SEDCAD model for 300x1000 area thru 20x1000 grass filter, 10 Year, 24 Hour...Exh. 7-23H-31 <br />Part I, Sediment Control System Analysis at End of Mining <br />IntroductoryText.......................................................................................................... Exh. 7-23I-1 <br />Exh. 7-23, Figure I1, Profile Along Little Collom and Bear Draw .............................. Exh. 7-23I-7 <br />Exh. 7-23, Figure 12, East Side SEDCAD Networking Schematic Diagram ............... Exh. 7-23I-8 <br />SEDCAD model for West Side, 10 Year, 24 Hour ....................................................... Exh. 7-23I-9 <br />SEDCAD model for West Side, 100 Year, 24 Hour ................................................... Exh. 7-231-30 <br />SEDCAD model for East Side, 10 Year, 24 Hour ...................................................... Exh. 7-231-46 <br />SEDCAD model for East Side, 100 Year, 24 Hour .................................................. Exh. 7-231-106 <br />Exh. 7 -23 -ii Revision Date: 11/09/15 <br />Revision No.: PR -04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.