Laserfiche WebLink
Historic Properties Treatment Plan, Collom Mine, Colorado <br />Two phases of work are proposed. Phase I excavation will consist of auger tests, 1 x t -m test <br />units, and backhoe trenches to assess the potential for significant buried archaeological deposits <br />at the sites. The primary goal of the Phase I excavations is to assess different areas of the sites <br />to determine the placement of the Phase II excavations. These phases will mitigate adverse <br />effects to the eligible properties. <br />Both phases of this project are guided by a research design presented below in Section 2.0. The <br />site descriptions and NRHP recommendations are included in Section 3.0. Section 4.0 consists <br />of the proposed scope of work for Phases I and II at each site. Finally, Section 5.0 presents field <br />methodology for Phases I and II, as well as laboratory methods for both phases. <br />47599 TRC Mariah Associates Inc. <br />