Laserfiche WebLink
RULE 3 PERFORMANCE BOND <br />RULE 3 PERFORMANCE BOND <br />11 <br />The Performance bond calculations for the Colowyo existing permit area are included in Exhibit 13A in <br />Vohxme 13, and the reclamation bond costs for the Collom mining area will be included in Exhibit 13B in <br />Volume 20. <br />Collom — Rule 3, Page 1 Revision Date: 3/13/15 <br />Revision No.: PR -04 <br />