Laserfiche WebLink
Twentymile Coal, LLC. <br />Page 3 <br />September 27, 2016 <br />10. On proposed revised page 14.4 of Exhibit 14, when site 115 is discharging, TC indicated <br />additional weekly monitoring of site 69, 115, 1003 and 1005 will be conducted. The paragraph <br />indicates that flow and electrical conductivity will be monitored at site 69, 115, and 1003 while <br />only electrical conductivity will be monitored at site 1005. The "Mine Discharge Calculator" on <br />Table E49-26, needs the flow rate from site 1005 as a required variable. Please revise this page to <br />indicate flow rate and electrical conductivity will be measured at site 1005 or explain in detail and <br />revise all applicable mine discharge calculator tables to justify not monitoring flow at this point. <br />11. The proposed revision indicated site 16 will be monitored and used for the Fish Creek Calculator, <br />approved Table EX49-25 also indicated data from site 16 will be used. Currently Exhibit 14 <br />indicates site 16A will be used. Please clarify this discrepancy. If site 16Awill be used please <br />revise this in the narrative proposed for Exhibit 14. If not, please update Table A, Surface Flow <br />of Exhibit 14 to indicate Site 16 will be monitored when pumping is occurring at Site 109 and <br />115. <br />12. Please update Table A, Hydrologic Monitoring Sites and Frequency for Bedrock Groundwater to <br />include the two new Wadge/Wolf Creek Interburden monitoring wells WC -008B and WC -013A <br />approved with PR10 and PRl 1. <br />13. Please update Table A, Hydrologic Monitoring Sites and Frequency for Bedrock Groundwater to <br />change the site number for the Fish Creek Sandstone monitoring wells as 91M001 and 91M004 <br />as they are currently designated and shown on Map 13A. <br />14. Please update Table A, Surface Flow April — May to include monitoring site 900A for Foidel <br />Creek. <br />15. Please revise Table A, Surface Flow April — May to indicate water quality will be sampled once <br />in April instead of March for the applicable monitoring sites. <br />16. Please revise Table A, Surface Flow June — September, to include monitoring site 304 and 900A <br />for Foidel Creek, site 1002 for Fish Creek, MC -1 and USGS 09243700 for Middle Creek. <br />17. Proposed Revised Table A, Surface Flow October — March currently is approved for a <br />monitoring schedule October— February. Please confirm that TC is proposing to update the <br />monitoring plan for monitor through March and not February. <br />18. Currently Table A, Surface Flow October — February requires monitoring for SW -13, proposed <br />revised Table A, Surface Flow October - March indicates that no monitoring will be conducted <br />at site SW -13. Please revise this to comply with the currently approved plan or provide detailed <br />justification for elimination of monitoring or this well. <br />