Laserfiche WebLink
LG EVERIST, INC. CORPORATE OFFICE <br /> • • 300 S PHILLIPS AVE •SUITE 203 <br /> P O BOX 5829 <br /> SIOUX FALLS SD 57 '7.5829 <br /> PHONE 505-334-5000 <br /> FAX 605-334-3656 <br /> MOUNTAIN DIVISION <br /> 7321 E BOTH AVENUE -SUITE 20C <br /> HENDERSON COLORADO 80640 <br /> 303.287.9606 <br /> FAX?01-289 ,34E <br /> July 11, 2016 <br /> PDC Energy, Inc. <br /> 1775 Sherman St Suite 3000 <br /> Denver, CO 80203 <br /> RE: Structure Agreement <br /> Carbon Valley Resource, Permit# M-2001-017 <br /> To whom it may concern : <br /> As you are aware from a previous notification letter to you, L.G. Everist, Inc., is amending their <br /> Colorado Mined Land Reclamation (MLR) permit to extract sand and gravel materials from <br /> Carbon Valley Resource (M-2001-017), located in the NW1/4, Sec 6, T2S, R67W, 6th Prime <br /> Meridian, Weld County, Colorado. For your information, the amendment is to add and addi- <br /> tional parcel of land to the site and develop it as a lined water storage reservoir. <br /> This letter and attached Structure Agreement is being sent to you as part of the permitting <br /> process to address an MLR rule that requires the operator/permittee to pursue an agreement <br /> with owners of any structures within 200 feet of the permit area, in which the operator agrees to <br /> reimburse the structure owner for any damage done to their structure as a result of the mining <br /> operation. In lieu of obtaining an agreement, the operator can provide the state with a <br /> Geotechnical study that demonstrates that any structures within 200 feet of the permit area shall <br /> not be damaged by activities occurring at the mining operation. The operator has already <br /> completed the study as part of the planning process for this mine and it indicates that the <br /> structures listed in this agreement will not be damaged by mining activities. <br /> We are sending this agreement to you as required by law, but also because we wanted to <br /> inform you of all the aspects of the MLR rules and also be able to provide you assurances that <br /> should something occur that we do not foresee, L.G. Everist, Inc. will repair or replace the <br /> damaged structure. <br /> Please return this agreement, signed and notarized, within 30 days of receiving it if possible. <br /> Enclosed is a stamped, addressed envelope so you can return the executed agreement to us. <br /> We have enclosed a second copy of the agreement for your files. Thank you for your coopera- <br /> tion. <br /> If you have any questions or need more information please call me at (303) 286-2247. <br /> Sincerely <br /> Lynn Mayer Shults <br /> Regulatory Manager <br /> SENT TO STRUCTURE OWNER VIA CER_'IFIED MAIL 4 7014 2870 0001 0807 9875 <br />