My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-23_GENERAL DOCUMENTS - C1982057
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982057
>
2016-09-23_GENERAL DOCUMENTS - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 9:42:52 AM
Creation date
9/27/2016 7:05:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
9/23/2016
Doc Name
Bond Reduction Request
From
Seneca Property, LLC
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Permit Renewal No. 6 Task Summa <br />Site: Seneca 11-W Mine Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 2/2/2016 County: Routt <br />User: JHB <br />Agency or organization name' DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1982057 <br />Abbreviation: None <br />Filename: C057-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />010 ! Doze Adjacent South Wadge Pit Spoil Ridges <br />020 Rip Facilities Area <br />029 Grade Culvert Embankments <br />030 Grade Haul Roads to Blend <br />035 Finish Grade All Mine Areas <br />038 Post Mine Drainage <br />039 ; Regrade Pond 009 <br />040 Regrade Pond 015 <br />041 Regrade Pond 016 <br />042 Regrade Pond 016a -completed but not bond <br />released <br />043 Regrade Pond 017 <br />045 Backfill and Regrade All Ditches <br />050 Replace Topsoil from Stockpile I to Shop and <br />Explosive Site <br />051 ' Replace Topsoil from Stockpile I to Road A <br />054 Replace Topsoil from Stockpile to Haul Road I <br />057 Replace Topsoil from Stockpile BB to Road A <br />058 Replace Topsoil from Stockpile to Raod A <br />059 Replace Topsoil from Stockpile BB to Final Pit <br />Area <br />060 Replace Topsoil from Stockpile C to Final Pit Area <br />061 Replace Topsoil from Stockpile FF to Final Pit <br />Area <br />069 Replace Topsoil from Stockpile TT to Permanent <br />Road J <br />070 Replace Topsoil from Stockpile UU to Permanent <br />Road 1 <br />072 Replace Topsoil from Stockpile WW to Final Pit <br />Area <br />073 Replace Topsoil from Stockpile XX to Final Pit <br />Area <br />074 I Replace Topsoil fi-om Stockpile YY to Haul Road <br />L <br />075 Replace Topsoil from Stockpile YY to Final Pit <br />Area <br />076 Replace Topsoil from Stockpile ZZ to Final Pit <br />Area <br />083 Replace Topsoil from Stockpile AAA to Final Pit <br />Area <br />DOZER <br />4 <br />2 <br />4 <br />1 <br />1 <br />1 <br />1 <br />] <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />110.63 <br />$237,340.00 <br />$10,452.00 <br />$116,707.00 <br />$11,407.00 <br />$3,582.00 <br />$44,405.70 <br />$8,330.00 <br />$8,330.00 <br />$8,330.00 <br />$16,911.00 <br />$7,693.00 <br />$896.00 <br />$39,807.00 <br />$53,942.00 <br />$61,886.00 <br />$3,275.00 <br />$60,843.00 <br />$36,635.00 <br />$79,377.00 <br />$11,879.00 <br />$28,387.00 <br />$14,732.00 <br />$89,411.00 <br />$139,337.00 <br />$155,731.00 <br />$135,366.00 <br />$127,264.00 <br />$180,392.00 <br />RIPPER <br />9.49 <br />DOZER <br />54.40 <br />GRADER <br />81.60 <br />GRADER <br />25.62 <br />NA <br />125.00 <br />DOZER <br />31.76 <br />DOZER <br />31.76 <br />DOZER <br />31.76 <br />DOZER <br />64.48 <br />DOZER <br />29.33 <br />GRADER <br />6.40 <br />SCRAPERI <br />42.25 <br />SCRAPER] <br />31.41 <br />SCRAPERI <br />36.04 <br />SCRAPERI <br />1.91 <br />SCRAPERI <br />35.43 <br />SCRAPERI <br />21.33 <br />SCRAPERI <br />46.22 <br />SCRAPERI <br />6.92 <br />SCRAPERI <br />16.53 <br />SCRAPER] <br />8.58 <br />SCRAPERI <br />52.06 <br />SCRAPERI <br />81.13 <br />SCRAPERI <br />90.68 <br />SCRAPERI <br />78.82 <br />SCRAPERI <br />74.10 <br />SCRAPERI <br />105.04 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.