My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-26_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2016-09-26_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 1:59:27 PM
Creation date
9/26/2016 11:42:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
9/26/2016
Doc Name
Adequacy Review & Cost Estimate
From
Blue Mountain Energy
To
DRMS
Type & Sequence
MR169
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operator Skill: <br />0.750 <br />Material consistency: <br />1.200 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.6484 <br />Adjusted unit 1,054.95 LCY/hr <br />production: <br />Adjusted fleet 1054.95 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.152/LCY <br />Total job time: 7.86 Hours <br />Total job cost: $1,259 <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />
The URL can be used to link to this page
Your browser does not support the video tag.