My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-23_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-09-23_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 9:21:50 AM
Creation date
9/26/2016 9:08:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/23/2016
Doc Name
Adequacy Review Response
From
DRMS
To
J. E. Stover & Associates, Inc.
Type & Sequence
MR161
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Colowvo Coal Mine <br />COST SUMMARY WORK <br />Reclaim Two Collom Monitoring Wells <br />Permit Action: MR161 <br />PROJECT IDENTIFICATION <br />Task #: 000 State <br />Date: 9/23/2016 County <br />Colorado <br />Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />Regrade Topsoil for Wells Trout Creek and MC- <br />DOZER <br />1 <br />0.28 <br />$145.00 <br />Total = $0.00 <br />04-02 <br />002 <br />Plug and Seal All Wells and Boreholes <br />BOREHOLE <br />1 <br />4.00 <br />$3,889.42 <br />003 <br />Seed & reseed 0.5 acres disturbance <br />REVEGE <br />1 <br />1.00 <br />$413.00 <br />Sagebrush/Steppe mix <br />SUBTOTALS: <br />5.28 <br />$4,447 <br />INDIRECT COSTS <br />$89.83 <br />OVERHEAD AND PROFIT: <br />$46.69 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />2.64 <br />Profit: <br />10.00 <br />Total = <br />$89.83 <br />Total = <br />$46.69 <br />Total = <br />$196.63 <br />Total = <br />$444.70 <br />TOTAL O & P = <br />$777.85 <br />CONTRACT AMOUNT (direct + O & P) = <br />$5,224.85 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />2.00 <br />Total = $104.50 <br />Reclamation management and/or administration: <br />1.91 <br />$99.79 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $982.14 <br />TOTAL BOND AMOUNT (direct + indirect) = $5,429.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.