Laserfiche WebLink
7. That all construction debris will be disposed of on lanc in such a manner that it cannot enter a waterway <br /> or wetland. <br /> 8. That equipment for handling and conveying materials during construction shall be operated to prevent <br /> dumping or spilling the materials into the water except as approved herein. <br /> 9. That measures will be employed to prevent or control spilled petroleum products, chemicals, or other <br /> deleterious materials from entering the water and the permittee will formulate a contingency plan to be <br /> effective in the event of a spill. <br /> 10. That all work in the waterway is performed in such a manner so as to minimize increases in suspended <br /> solids and turbidity which may degrade water quality and damage aquatic life outside the immediate area of <br /> operation. <br /> 11. That fuel storage tanks above ground shall be diked or curbed or other suitable means provided to <br /> prevent the spread of liquids in case of leakage in the tanks or piping. <br /> 12. That the clearing of vegetation will be limited to that which is absolutely necessary for <br /> construction of the project. <br /> 13. That when the District Engineer has been notified that a filling activity is adversely affecting fish or <br /> wildlife resources or the harvest thereof and the.District Engineer subsequently directs remedial measures, <br /> the permittee will comply with such directions as-may be received to suspend or modify the activity to the <br /> extent necessary to mitigate or eliminate the adverse effect as required. <br /> 14. That all dredged or excavated materials, with the exception of that authorized herein, will be placed on <br /> an upland site above the ordinary high water line in a confined area, not classified as a wetland, to prevent <br /> the return of such materials to the waterway. <br /> 15. That all earthwork operations on shore/bank will be carried out in such a manner that sediment runoff <br /> and soil erosion to the water and wetlands are prevented. <br /> 16. That all areas along the bank disturbed or newly created by the construction activity will be seeded wiih <br /> vegetation indigenous to the area for protection against subsequent erosion. <br /> 17. That the.cross-sectional area of the channel is not reduced to less than eristing prior to, during, <br /> and after any construction activity. <br /> 18.That the fill created by the discharge will be properly maintained to prevent erosion and other non-paint <br /> source of pollution. <br /> 19. That close coordination will be maintained by the contractor with downstream water users, advising <br /> them of any water quality changes to be caused by the construction. <br /> 20. That the disposal area, method of disposal, or methods of dredging will not be changed without prior <br /> written approval of the District Engineer. <br /> 21. That the discharge will consist of suitable material free from toidc Pollutants. <br /> 7. <br />