Laserfiche WebLink
-4- <br /> 12. Primarx future(Post-minin land use check one): <br /> EJ Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) `� Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use check one): <br /> Cropland(CR) _ Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) �{ Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(1C) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Mining will be with dozer, front-end loader, and trucks <br /> 15. On Site Processing: n Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> N/A <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> N/A <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> We are proposing to again expand the size of the Ward Pit opening 10.2 acres to the east of the <br /> current pit. As we complete mining in the original 112 pit, we will begin reclamation there and <br /> ning to the newly <br /> pened area. <br />