Laserfiche WebLink
INTRODUCTION <br />Taylor/Lower Wilson projects. The format will parallel the Colorado coal mining regulations. This <br />application focuses on the requirements of Rule 2, specifically Rule 2.04, Rule 2.05, and certain aspects <br />of Rule 2.01, 2.02, 2.03, and 2.06; Rule 3 — Performance Bond Requirements; and Rule 4 — Performance <br />Standards. <br />2.03.3(1-5) Format and Supplemental Information <br />Please see Section 2.03.3 in Volume 1. <br />2.03.3(6) CDRMS Application to Conduct Coal Mining <br />Please see Section 2.03.3(6) in Volume 1. <br />2.03.3(7) Entities Consulted to Obtain Permit Information <br />Please see Section 2.03.3(7) in Volume 1. <br />2.03.3(8) Copies <br />Please see Section 2.03.3(8) in Volume 1. <br />2.03.3(9) Certification by Responsible Official <br />Please see Section 2.03.3(8) in Volume 1. <br />2.03.4 Identification of Interests <br />Please see section 2.03.4 in Volume 1 and Exhibit 2 in Volume 2A for current ownership and control <br />information. <br />The surface and mineral ownership in the permit and adjacent areas is located in Section 2.03.4, Volume <br />1, and Volume 2A, Exhibit 1, Documents and Leases. <br />2.03.5 Compliance Information <br />Please see Section 2.03.5 in Volume 1. <br />2.03.6 Right of Entry and Operational Information <br />The documents contained in Exhibit 1 (Volume 2A), vests the rights shown in and to surface estate and to <br />the coal estate within the South Taylor/Lower Wilson permit revision area. Additionally, please see <br />Section 2.03.6 in Volume 1. <br />2.03.7 Relationship to Areas Designated Unsuitable For Mining <br />The South Taylor/Lower Wilson permit revision area is not within an area designated unsuitable for <br />surface mining activities as defined in Rule 7 or 30 CFR 764 and 769 or under study for designation in an <br />administrative proceeding under Rule 7 or 30 CFR 764 and 769. <br />South Taylor/Lower Wilson — Rule 2, Page 2 Revision Date: 11/19/15 <br />Revision No.: PR -04 <br />