Laserfiche WebLink
Transit Mix Concrete Co. <br /> 1 A <br /> a ttV - <br /> j•,�4 <br /> � J <br /> Figure G-2 <br /> LTC-1 Surface Water Monitoring Station, August 26, 2015 <br /> Instantaneous streamflow measurements are summarized in Table G-1. Due to dry conditions <br /> at LTC-1 during the November 16, 2015 visit, streamflow was measured approximately 1/3 of a <br /> mile upstream where flow was present. Streamflow was also measured on April 12, 2016 and <br /> June 22, 2016 at the upstream location. The transducer was moved to this upstream location on <br /> April 14, 2016 due to the headgate located immediately downstream from the original LTC-1 <br /> location having work done to it resulting in ponding at the location. All data will be collected at <br /> the new LTC-1 location until the proposed Water Monitoring Plan is approved and implemented. <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> September 15, 2016 G-5 <br />