My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-16_PERMIT FILE - M2016010
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
2016-09-16_PERMIT FILE - M2016010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 12:48:05 AM
Creation date
9/19/2016 3:34:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Date
9/16/2016
Doc Name Note
Response #5
Doc Name
Adequacy Review Response #5
From
Transit Mix Concrete Co.
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Transit Mix Concrete Co. <br /> THIRD REVIEW OF BLASTING PLAN; TRANSIT MIX <br /> CONCRETE CO.; HITCH RACK RANCH QUARRY; FILE NO. <br /> M-2016-010 <br /> DRMS COMMENTS-PETER HAYS <br /> 1) Comment: In the Mitigation Plan section of the Pre-Blasting Survey Plan included in <br /> Exhibit D, the Applicant states in the event a well is determined to be damaged or "dry" <br /> and it is determined Transit Mix Concrete Co. is at fault,a new well producing a similar or <br /> greater quantity and quality of water as the original well will be drilled at Transit Mix <br /> Concrete Co.'s cost. Please commit to installing a new well producing at the historic level <br /> or greater if Transit Mix Concrete Co. is determined to be at fault for damage to the well. <br /> Response: Transit Mix has revised the Pre-Blast Survey Plan in response to this <br /> comment. The text has been revised to clarify the new well will produce at the historic <br /> level or greater, as measured during the pre-blast survey, drill record, or other <br /> existing document. <br /> 2) Comment: In the Mitigation Plan section of the Pre-Blasting Survey Plan included in <br /> Exhibit D, the Applicant states if DRMS determines blasting at the Hitch Rack Ranch <br /> Quarry was the cause for degraded water quality and the quality never returns to the same <br /> level of the pre-blast survey, Transit Mix Concrete Co. will, at their cost, drill a new well <br /> producing a similar or greater quantity and quality of water as the original well. Please <br /> commit to installing a new well producing at the historic level or greater if Transit Mix <br /> Concrete Co. is determined to be at fault for the degraded water quality. <br /> Response: Transit Mix has revised the Pre-Blast Survey Plan in response to this <br /> comment. The text has been revised to clarify the new well will produce at the historic <br /> water quality or greater, as measured during the pre-blast survey, drill record, or <br /> other existing document. <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> September 15, 2016 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.