Laserfiche WebLink
� ' o Transit Mix Concrete Co. <br /> debris bypasses the trash rack and becomes lodged in the culvert, the culvert is large <br /> enough that men and small equipment can enter the culvert for maintenance. <br /> 31)Comment: Figures G-9, G-10 and G-11. Unimpacted Drainage. The line representing <br /> the upland diversion ditch along the west side of the topsoil stockpile (as shown on Figure <br /> G-8) does not appear on either of these drawings. How is undisturbed runoff from <br /> subbasins P1 and P2 handled? <br /> Response: Runoff from undisturbed areas is routed to Little Turkey Creek via ditch <br /> CWD-3. Runoff from disturbed areas is routed down ditch DD-1 and into sediment <br /> detention basin P-SP-2. <br /> 32)Comment: Figure G-12 and Table G-4. The Division could not find closure channel <br /> designs or analyses for either the terrace channels on the reclaimed fines stockpile(T-1, T- <br /> 2, or T-3) or the contact channel along the west side of the south end of the reclaimed fines <br /> stockpile (F 1 b). Please provide the appropriate analyses and designs for these channels. <br /> Response: Designs for the terrace ditches have been added to Table G-4. <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> September 15, 2016 10 <br />