My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-16_PERMIT FILE - M2016010
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
2016-09-16_PERMIT FILE - M2016010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 12:48:05 AM
Creation date
9/19/2016 3:34:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Date
9/16/2016
Doc Name Note
Response #5
Doc Name
Adequacy Review Response #5
From
Transit Mix Concrete Co.
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 F' <br /> Transit Mix Concrete Co. <br /> 10)Comment: Page G-13 [now p. G-1711 paragraph b, Sediment Ponds. The response <br /> confirming none of the detention basins will be jurisdictional is adequate. <br /> Response: No further response is necessary. <br /> 11)Comment: Page G-14 [now p. G-181, paragraph c, Culverts. The response is adequate. <br /> Table G-6 was not checked as peak flows will increase based on the response to Comment <br /> No. 4. <br /> Response: No further response is necessary. Table G-6 has been revised. <br /> 12)Comment: Page G-15 [now p. G-181, Culverts LTC-CC-1 through LTC-CC-6. The <br /> response is adequate. However, Table G-6 was not checked as peak flows will increase <br /> based on the response to Comment No. 4 <br /> Response: No further response is necessary. Table G-6 has been revised. <br /> 13)Comment: Pa e G�-15 [now p. G-191, Table G-6. The response is adequate. <br /> Response: No further response is necessary. Table G-6 has been revised. <br /> l 4)Comment: Page G-16 [now p. G-201, Paragraph d. The response is adequate. <br /> Response: No further response is necessary. <br /> 15)Comment: Figure G-5. The purpose of the LTC culverts... The response is adequate. <br /> Response: No further response is necessary. <br /> 16)Comment: Figure G-6. The response is adequate. <br /> Response: No further response is necessary. <br /> 17)Comment: Figure G-7. The requested ditch and grade-to-drain directions were not <br /> provided. Please provide the requested information. <br /> Response: Figure G-7 has been revised to show the direction of flow in each of the <br /> ditches. <br /> 18)Comment: Figure G-8. The requested ditch and grade-to-drain directions were not <br /> provided. Please provide the requested information. <br /> Response: Figure G-8 has been revised to show the direction of flow in each of the <br /> ditches. <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> September 15, 2016 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.