My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-17_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2016-09-17_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2016 1:25:15 PM
Creation date
9/19/2016 11:42:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
9/17/2016
Doc Name
Application
From
GCC Energy, LLC
To
DRMS
Type & Sequence
MR41
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fw y� <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />• lg76 • 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 035 Date: 09 /14 / 2016 <br />Permittee: GCC Energy, LLC <br />King Coal Mine <br />Street: 6473 County Road 120 <br />City: Hesperus <br />State: Co Zip Code: 81326 _ <br />Brief Description of Revision: Minor Revision 41 (MR -41): King I Mine - Refuse Pile <br />Sampling Plan <br />Public Notice Attached: Yes[] No ❑(Required for PRs and TRs) <br />Bond Increase: Yes❑ No❑ Federal ❑ Non -Federal ❑ Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed (+/-) _ _ <br />0 0 Acres <br />Permit (+/-) _ _ <br />0 . 0 Acres <br />Affected (+/-) _ _ <br />0 0 Acres <br />Mineral Ownership - <br />Mineral Private (+/-) <br />_ _ 0 0 Acres <br />Mineral Federal (+/-) <br />_ _ 0 . 0 Acres <br />Surface Ownership - <br />Private Land (+/-) _ _ 0 0 Acres <br />Federal Land (+/-) _ _ 0 0 Acres <br />State Land (+/-) _ _ 0 0 Acres <br />Mineral State (+/-) _ _ 0 0 Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.