My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-17_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2016-09-17_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2016 1:25:15 PM
Creation date
9/19/2016 11:42:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
9/17/2016
Doc Name
Application
From
GCC Energy, LLC
To
DRMS
Type & Sequence
MR41
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCC <br />GCC Energy, LLC <br />Energy Telephone: 970.385.4528 6473 County Road 120 <br />"Safety as a Value" Facsimile: 970.385.4638 Hesperus, CO 81326 <br />September 14, 2016 <br />State of Colorado <br />Division of Reclamation, Mining 8s Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Attn: Rob Zuber, Environmental Protection Specialist II <br />Re: GCC Energy, LLC, King II Mine <br />CDRMS Permit # C-1981-035 <br />Minor Revision No. 41 (MR -41) Initial Submittal <br />King I Mine - Refuse Pile Sampling Plan <br />Mr. Zuber: <br />Please find attached Minor Revision MR -41, "King I Mine - Refuse Pile Sampling Plan". <br />This refuse pile sampling plan was originally submitted December 28, 2015 in <br />response to the Division's letter of June, 09, 2015, as a "Supplement" to Technical <br />Revision TR -20, "King I Portal Area - West Waste Bank Designs". <br />Due to the desire of all parites concerned to charactarize the chemical makeup of the <br />existing refuse pile at the King I mine, and to charactarize the chemical makeup of any <br />future material additions to the pile, GCC Energy has extracted the parts of TR -20 <br />relevent to refuse pile sampling and is submitting them herewith as Minor Revision <br />No. 41 (MR -41). <br />The remaining portions of Technial Revision TR -20 will be addressed under separate <br />cover. <br />Please find enclosed: <br />• Minor Revision #41 CDRMS Application Form <br />• King I Permit Cover Page <br />• King I Permit Section 2.04.6 page 5 <br />• King II Permit Cover Page <br />• King II Permit Table of Contents page ii <br />• King II Permit Section 2.04.6 pages 6,7 8v 8 <br />• King II Permit Appendix 4(8) <br />
The URL can be used to link to this page
Your browser does not support the video tag.