My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-01_PERMIT FILE - C1981010A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2016-08-01_PERMIT FILE - C1981010A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2017 8:52:18 AM
Creation date
9/19/2016 9:45:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
8/1/2016
Doc Name
TEMPORARY DIVERSION DESIGN
Section_Exhibit Name
APPENDIX Q SECTION XVII
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDCAD 4 for Windows <br />r-,rinhr aoou _,)nn7 oma. 1. i crh,.,oh <br />7 <br />Erodible Channel Results: <br />Structure #10 (Pond,) <br />Pond Inputs: <br />Pond Results: <br />Peak Elevation: 71204.36 ft <br />Dewater Time: 0.81 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation -Capacity -Discharge Table <br />w/o Freeboard w/ Freeboard <br />Design Discharge: <br />23.67 cfs <br />Depth: <br />0.16 ft 0.46 ft <br />Top Width: <br />24.97 ft 26.77 ft <br />velocity: <br />5.95 fps <br />X -Section Area: <br />3.98 sq ft <br />Hydraulic Radius: <br />0.159 ft <br />Froude Number: <br />2.63 <br />Peak Elevation: 71204.36 ft <br />Dewater Time: 0.81 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation -Capacity -Discharge Table <br />Initial Pool Elev: <br />7,204.00 ft <br />Discharge <br />Dewater <br />Initial Pool: <br />1.31 ac -ft <br />Emergency Spillway <br />Time <br />Spillway Elev Crest Length Left <br />Right Bottom <br />(ft) Sideslope <br />Sideslope Width (ft) <br />7,204.00 30.00 3.00:1 <br />3.00:1 20.00 <br />Peak Elevation: 71204.36 ft <br />Dewater Time: 0.81 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation -Capacity -Discharge Table <br />Filename: DJ_Divert_10yr_24hr.sc4 Printed 06-08-2016 <br />Area <br />Capacity <br />Discharge <br />Dewater <br />Elevation <br />Time <br />(ac) <br />(ac -ft) <br />(cfs) <br />(hrs) <br />7,200.00 <br />0.000 <br />0.000 <br />0.000 <br />7,200.50 <br />0.150 <br />0.025 <br />0.000 <br />7,201.00 <br />0.200 <br />0.112 <br />0.000 <br />7,201.50 <br />0.300 <br />0.236 <br />0.000 <br />7,202.00 <br />0.350 <br />0.399 <br />0.000 <br />7,202.50 <br />0.400 <br />0.586 <br />0.000 <br />7,203.00 <br />0.450 <br />0.798 <br />0.000 <br />7,203.50 <br />0.500 <br />1.036 <br />0.000 <br />7,204.00 <br />0.600 <br />1.310 <br />0.000 <br />Spillway #1 <br />7,204.36 _ <br />0.629 <br />1.537 <br />16.306 <br />19.55 Peak Stage <br />7,204.50 <br />0.650 <br />1.623 <br />22.496 <br />Filename: DJ_Divert_10yr_24hr.sc4 Printed 06-08-2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.