My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-01_PERMIT FILE - C1981010A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2016-08-01_PERMIT FILE - C1981010A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 11:41:47 AM
Creation date
9/19/2016 9:38:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
8/1/2016
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix A Reclamation Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table A-14.1 Cont. Equipment Mobilization/Demobilization <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest Major City or Town within project area region HAYDEN <br />Total One way Travel Distance 25 miles <br />Average Travel Speed 45 mph <br />Round Trips <br />Total Non- Roadable mob -demob cost* 2 1 $ 35,218.19 <br />*two round trips with haul rig <br />Total Roadable mob -demob Cost** $ 142.36 <br />** one round trip, no haul rig <br />Transportation Cycle Time <br />Non Roadable I Roadable <br />Eauinment1 Enuinment <br />Haul Time (Hours) <br />0.56 <br />0.56 <br /># of Units <br />Return Time (Hours) 0.56 <br />0.56 <br />Loading Time (Hours) 0.5 <br />NA <br />Unloading Time (Hours) 0.5 <br />NA <br />Subtotals 2.11 <br />1.11 <br />otal Job Time (Hours) <br />Page No. 49 <br />4.22 * Costs from Wagner Rentals; Mob/demob is from Aurora, Colorado <br />TRUCK/TRACKHOE MOB/DEMOB COSTS <br />/Unit <br /># of Units <br />CAT 5130 Mobilzation <br />$ 53,683.00 * <br />$ <br />53,683.00 <br />1 <br />CAT 5130 Assembly <br />$ 49,150.00 * <br />$ <br />49,150.00 <br />1 <br />CAT 5130 Disassembly <br />$ 34,433.00 * <br />$ <br />34,433.00 <br />1 <br />CAT 5130 Demobilization <br />$ 53,683.00 * <br />$ <br />53,683.00 <br />1 <br />Cat 777 Mobilization <br />$ 147,980.00 * <br />$ <br />21,140.00 <br />7 <br />Cat 777 Assembly <br />$ 144,056.50 * <br />$ <br />20,579.50 <br />7 <br />Cat 777 Disassembly <br />$ 91,729.75 * <br />$ <br />13,104.25 <br />7 <br />Cat 777 Demobilization <br />$ 147,980.00 * <br />$ <br />21,140.00 <br />7 <br />otal Job Cost <br />,err 4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.