My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-06_INSPECTION - C1980004
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980004
>
2013-09-06_INSPECTION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 9:27:10 AM
Creation date
9/19/2016 8:24:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Inspection
Doc Date
9/6/2013
Doc Name
Inspection Report
From
DRMS
To
McClane Canyon Mining, LLC
Inspection Date
8/23/2016
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 23, 2016 C-1980-004/McClane Canyon Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 6 <br /> <br />The SAE silt fence to the facility area was stable. The sump prior to the sit fence held water but was not <br />discharging from the sump and silt fence. <br /> <br />The three upland diversion culverts located near the portals were inspected. The trash guard located along t he <br />middle diversion culvert located just to the left of the belt line portal needs to be cleaned. The guard has mud <br />partially “caked” onto guard. <br /> <br /> <br />Mud on trash guard. Sediment pond. <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />The haul road was inspected. Sediment has settled within the haul road ditch along the southern end. This section <br />of the ditch needs to be established. <br /> <br />SIGNS AND MARKERS – Rule 4.02: <br />Mine identification sign is located at the gated entrance to the site. All required information for compliance was <br />located on the sign. <br /> <br />Disturbance markers were located along the disturbed areas of the site. Markers are red painted rebar. <br /> <br />Topsoil marker was located on top of the topsoil pile. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4:
The URL can be used to link to this page
Your browser does not support the video tag.