Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> August 2016 Monthly Report <br /> Page 2 <br /> Table 1-August 2016 Ground Water Monitoring Well and Lysimeter Depth to Water <br /> Measurements <br /> Monitoring Site Date Depth to Water(feet) <br /> M-4R 8/31/16 0 <br /> M-6 8/31/16 Dry <br /> M-7 8/31/16 Dry <br /> M-8 8/31/16 Dry <br /> M-9 8/31/16 141.78 <br /> M-10 8/31/16 25.61 <br /> M-11 R 8/31/16 40.69 <br /> M-12 8/31/16 175.41 <br /> M-13R 8/31/16 126.36 <br /> M-14 8/31/16 131.42 <br /> M-15 8/31/16 89.97 <br /> M-16 8/31/16 22.59 <br /> M-19 8/31/16 24.81 <br /> M-21 8/31/16 19.05 <br /> M-22 8/31/16 17.47 <br /> M-26 8/31/16 16.38 <br /> M-32 8/31/16 44.98 <br /> M-33 8/31/16 57.21 <br /> M-34 8/31/16 23.88 <br /> BF-4 8/31/16 25.89 <br /> BF-6 8/31/16 30.91 <br /> LS-1R 8/31/16 Dry <br /> LS-2R 8/31/16 Dry <br /> LS-3 8/31/16 Dry <br /> LD-1 R 8/31/16 Dry <br /> LD-2R 8/31/16 Dry <br /> LD-3 8/31/16 Dry <br /> Table 2—August 2016 Tailing Disposal Area Piezometer Depth to Water <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P6 8/30/16 Dry 72.46 0.00 <br /> P7 8/30/16 92.29 92.50 0.21 <br /> P8 8/30/16 96.78 97.51 0.73 <br /> P9 8/30/16 71.93 72.30 0.37 <br />