observed at the toe of the ECOSA where the leak was previously occurring. On August 18, <br /> 2016, Newmont submitted and received verbal approval of an Addendum to TR#80 requesting <br /> an additional temporary fresh water line tie-in below the break in the Grassy Valley Pipeline and <br /> placement of a portable water stand to provide water to the HGM. <br /> Pipe Reroute <br /> The new permanent fresh water line will tie into the existing Grassy Valley Pipeline at the toe of <br /> the ECOSA dump (Drawing NO. 30-605-18 Water Line Plan) and carry fresh water originating at <br /> the Grassy Valley Pump Station around the ECOSA dump to tie back into the existing line. The <br /> existing pipeline will be abandoned beyond the tie in location until the new line ties back into it <br /> above the dump. The new 8 inch carbon steel pipeline will connect into a T that has already <br /> been installed for the additional temporary pipeline and water stand approved in the Addendum <br /> to TR#80. The entire pipeline will be buried subsurface at a depth of 6 feet to the top of the pipe <br /> and run a total of 10,837 feet. The new 8 inch carbon steel pipeline will follow the toe of the <br /> ECOSA dump, subsurface, and go around the topsoil stockpile for a total length of 5,527 feet <br /> where it will switch to an 8 inch HDPE DR 07 line and run another 2,187 feet. The new pipe then <br /> will switch to an 8 inch HDPE DR 11 pipe for the remainder 3,123 feet where it will tie back into <br /> the existing line abandoned underneath the ECOSA dump. The design of the pipe and burial of <br /> the pipeline will accommodate haul truck traffic in all areas even though it only crosses a haul <br /> road once. Please see the attached drawings for the designs and water line profile. <br /> Pipe Specifications <br /> -Maximum flow 925 gpm <br /> -Maximum pressure at the pump is 224 psig <br /> -8" Carbon Steel Pipe; 5,527 feet includes a 10% safety factor on length <br /> -8" HDPE DR 07, 4YQ spec; 2,187 feet includes a 10% safety factor on length <br /> -8" HDPE DR 11, 4YR spec; 3,123 feet includes a 10% safety factor on length <br /> Schedule <br /> The temporary line will take approximately eight weeks to install. Installation will begin <br /> immediately upon approval of this TR. If installation were to commence by mid-September <br /> 2016, the line would be available for use by mid-November 2016 as depicted in TR#80. <br /> Financial Warranty <br /> Newmont has determined the installation of this pipeline will not affect the financial warranty <br /> carried with the state as the line is entirely buried, therefore, will be capped and abandoned <br /> upon closure. <br /> Enclosed please find check no. 200024123 in the amount of $1,006 for the technical revision <br /> fee. Should you require further information please do not hesitate to contact me at (719) 689- <br /> 4055 or Meg.Burtc@newmont.com. <br /> Sincerely, <br /> Meg Burt <br /> Environmental Manager <br /> M B/cbt <br /> Attachments <br /> ec: T. Cazier— DRMS <br />