My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-14_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-09-14_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 10:58:07 PM
Creation date
9/15/2016 2:04:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
9/14/2016
Doc Name
Request for Technical Revision
From
Newmont
To
DRMS
Type & Sequence
TR84
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1. <br /> Earthwork,Demolition&ReveRetation <br /> Slope Outside banks of road and parking lot <br /> Dimensions Units Cost per unit Total Cost <br /> Average Height of fill 25 ft <br /> Mid Bench Length 2,900 ft <br /> Regrading vol ume(2.5:1 slopes f rom 1.4:1 angle of repose) 9,452 cubic yards $ 0.20 $ 1,899 <br /> Ripping/scarifying $ 1,899 <br /> Topsoil 6 inches <br /> Growth Media volume 10,963 cubic yards $ 1.52 $ 16,626 <br /> Revegetate(seed,mulch chemical fertilizer) 13 acres $ 842.77 $ 10,956 <br /> SubTotal $ 31,380 <br /> Cut V-Notch Channel <br /> Depth at v-notch cut at center 50 feet <br /> Cut Channel through road/parking lot(30ft wide,2.5:1 slopes) 141,222 cubic yards $ 0.38 $ 53,322 <br /> Haulage of onsite source of rip rap 760 cubic yards $ 2.89 $ 2,194 <br /> Place 6 inch gabions rip rap(30ft channel and loft up embankment) 760 cubic yards $ 23.35 $ 17,746 <br /> Revegetatete(seed mulch,chemical fertilize) 2.8 acres $ 732.50 $ 2,051 <br /> SubTotal $ 75,313 <br /> Demolition <br /> Foundation concrete break 40 cubic yards $ 12.10 $ 484 <br /> Foundation concrete bury 7 cubic yards $ 113.14 $ 792 <br /> Power Pole and line(power and communications)removal 1,600 feet $ 7.68 $ 12,291 <br /> Revegetate(seed mulch,chemical fertilize) 0.2 acres $ 910.00 $ 182 <br /> Demolition Crew(Foreman,3 skilled laborers,420 backhoe for 8hrs) 8 hrs $ 286.63 $ 2,293 <br /> SubTotal $ 16,042 <br /> Mob/Demob $ 13,861 <br /> Direct Cost total $ 136,596 <br /> Contingency(22%) $ 30,051 <br /> GRAND TOTAL ESTIMATE $ 166,647 <br /> Schedule <br /> The construction of the North Grassy Valley access road is anticipated to take approximately <br /> twelve weeks, weather permitting. Construction is planned to begin immediately upon approval <br /> of this TR. <br /> Should you require further information please do not hesitate to contact me at (719) 689- 4055 <br /> or Meg.Burt(c�newmont.com. <br /> ab-'-I <br /> Sincerel <br /> '� I <br /> Meg Burt <br /> Senior Environmental Manager <br /> M B/rp <br /> Attachments <br /> ec: T. Cazier- DRMS <br /> File <br />
The URL can be used to link to this page
Your browser does not support the video tag.