My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-13_PERMIT FILE - M2016050
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016050
>
2016-09-13_PERMIT FILE - M2016050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 9:58:21 PM
Creation date
9/15/2016 2:03:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016050
IBM Index Class Name
PERMIT FILE
Doc Date
9/13/2016
Doc Name
Application
From
C Road Pit
To
DRMS
Email Name
SJM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 1 18.7 Max disturbance <br /> C Road Pit Reclamation Estimate <br /> Totals for the Entire Pit <br /> Task Item FT SF Subtotal 18.7/75 acres 2012 unit cost <br /> 01a Reduce active highwall to 3HAV 4285 L 2400 Area of Slope 380889 94968 Cubic Yards $ 0.29 $ 0.33 $$/Yard $ 30,890.53 <br /> 02a Pace topsoil above high wall slopes 0.25 Thickness 539910 Area of Slope 4999 1246 Cubic Yards 1.037 $ 1.17 $$/Yard $ 1,454.81 <br /> 03a Push topsoil down regraded highwall slopes 0.25 Thickness 539910 Area of Slope 4999 1246 Cubic Yards 0.193 $ 0.22 $$/Yard $ 270.76 <br /> 04a Remove and spread visual berm material 4285 L 48 Area of Berm 7618 1899 Cubic Yards 0.262 $ 0.29 $$/Yard $ 560.09 <br /> 06a Spread overburden on pit floor 1 Thickness 3049200 Area of Floor 112933 28158 Cubic Yards 1.058 $ 1.19 $$/Yard $ 33,530.27 <br /> 07a Spread topsoil on overburden 0.25 Thickness 3049200 Area of Floor 28233 7040 Cubic Yards 1.058 $ 1.19 $$/Yard $ 8,382.57 <br /> 08a Spread topsoil on pit floor 70 17 Acres 80.4 $ 90.49 $$/Yard $ 1,579.37 <br /> 09a Revegetate high wall slopes 4285 ONETIME 539910 Area of Slope 12 3 Acres 451.88 $ 508.59 $$/Acre $ 1,571.76 <br /> 30a Mobilization 1 ONETIME 1 1 EACH 4748.53 $5,344.51 $$/Each $ 5,344.51 <br /> $ 83,584.67 <br /> Overhead,management profit as a total 27% $ 22,567.86 <br /> Total $ 106,152.53 <br /> Phase 2 40 Max disturbance <br /> Reclamation Estimate <br /> Totals for the Entire Pit <br /> FT SF Subtotal 40/75 acres 2012 unit cost <br /> Task Item 4285 L 2400 Area of Slope 380889 203141 Cubic Yards $ 0.29 $ 0.33 $$/Yard $ 66,076.00 <br /> 01a Reduce active highwall to 3HAV 0.25 Thickness 539910 Area of Slope 4999 2666 Cubic Yards 1.037 $ 1.17 $$/Yard $ 3,111.89 <br /> 02a Pace topsoil above high wall slopes 0.25 Thickness 539910 Area of Slope 4999 2666 Cubic Yards 0.193 $ 0.22 $$/Yard $ 579.17 <br /> 03a Push topsoil down regraded highwall slopes 4285 L 48 Area of Berm 7618 4063 Cubic Yards 0.262 $ 0.29 $$/Yard $ 1,198.06 <br /> 04a Remove and spread visual berm material 1 Thickness 3049200 Area of Floor 112933 60231 Cubic Yards 1.058 $ 1.19 $$/Yard $ 71,722.50 <br /> 06a Spread overburden on pit floor 0.25 Thickness 3049200 Area of Floor 28233 15058 Cubic Yards 1.058 $ 1.19 $$/Yard $ 17,930.63 <br /> 07a Spread topsoil on overburden 70 37 Acres 80.4 $ 90.49 $$/Yard $ 3,378.33 <br /> 08a Spread topsoil on pit floor 4285 ONE TIME 539910 Area of Slope 12 7 Acres 451.88 $ 508.59 $$/Acre $ 3,362.05 <br /> 09a Revegetate high wall slopes 1 ONE TIME 1 1 EACH 4748.53 $5,344.51 $$/Each $ 5,344.51 <br /> 10a Mobilization $ 172,703.13 <br /> Overhead,management profit as a total 27% $ 46,629.85 <br /> Total $ 219,332.98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.