September 8, 2016 C-1981-033/Bear Mine LDS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 2 of 6 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />N - Availability of Records <br />N - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />N - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />N - Gen. Compliance With Mine Plan <br />N - Other <br />N - Processing Waste <br /> <br />Y - Roads <br />R - Reclamation Success <br />N - Revegetation <br />N - Subsidence <br />Y - Slides and Other Damage <br />N - Support Facilities On-site <br />N - Signs and Markers <br />N - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />N - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a partial inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety <br />(Division). The Bear Mine permit was revoked on 6/6/2013. <br />The weather was clear, fine and dry. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> The sediment pond was dry. <br />The treatment pond was holding water well above the level of the river, as usual. <br />Water was continuing to seep from the toe of the slide area, following several flow paths. <br />The North Fork of the Gunnison River was flowing at around 230 cfs, according to the USGS gaging <br />station at Somerset, which is broadly in line with the seasonal average. <br /> <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br /> The contract for the reclamation project was awarded to McCollom’s Excavating, out of Hotchkiss. It is <br />expected that work will begin on October 1st and that the contractors will be on site for most of the month. The <br />project is still on schedule, although the purchase order has not yet been fully executed. <br /> <br />DOCUMENTS RECEIVED <br />N/A <br /> <br />OTHER (SPECIFY) <br />N/A <br /> <br />