Laserfiche WebLink
SECTION 5.0 Topsoil Stockpile Locations <br />Trapper's approved permit (Section 4.9.2) specifies that CDRMS will be provided with map(s) illustrating <br />the location of topsoil stockpiles constructed during the previous year and the approximate locations for <br />stockpiles proposed for construction during the upcoming year (Map 1). <br />Table 5-1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br />approximate center of the pile), acres, construction date and volume; which is updated annually. <br />During 2015, Trapper depleted topsoil pile G2-06 for reclamation of parcel Z -A-15 and removal of the <br />pile in advance of stripping operations. The remaining topsoil from G2-06 was placed in two smaller <br />piles, K1-15 and K2-15 for use in 2016. <br />At the end of 2015, excluding stockpiles abandoned with the approvals of MR -155 and TR -94, there are <br />59 existing topsoil stockpiles at Trapper affecting 153 acres and storing approximately 3,024,225 cubic <br />yards of salvaged topsoil. <br />Presently there are no proposed approximate locations for new topsoil stockpiles in 2016. Trapper is <br />planning to utilize existing topsoil stockpiles for the 2016 reclamation season. <br />GCR/BDN 3/16 <br />[Annual Report\DRMS15RPT\15TStext5-0] <br />