Laserfiche WebLink
Table 4.8-7 Embankment Designs (continued). <br />Principal Spillway <br />Stage (ft) 11.7(1) 15.5(1) 14.0(1) 13.3(1) 10.0(1) 11.3(1) 13.0(1) 16.8 <br />Elevation (ft) 6914.7 6900.5 6882.0 7233.3 6820.0 6873.3 7187.0 7287.0 <br />Diameter -d (in) <br />Emergency Spillway <br />Middle <br />Middle <br />Middle <br />East <br />West <br />Flume <br />Flume <br />Flume <br />Horse Middle <br />East Horse Deal <br />Sedimentation Pond: <br />#1 (2) <br />#2 <br />#3 (2) <br />#1 Enlarged Flume #1 (2) <br />Flume #1 (2) (3) (4) <br />? Elevation (ft) <br />6914.7 <br />6900.5 <br />6882.0 <br />7233.3 <br />6820.0 <br />Elevation Upstream <br />6903.0 <br />6885.0 <br />6868.0 <br />7227.0 6810.0 <br />6862.0 7186.0 7270.2 <br />Toe (ft) <br />0.5 <br />0.5 <br />0.5 <br />0.0 <br />Principal Spillway <br />Stage (ft) 11.7(1) 15.5(1) 14.0(1) 13.3(1) 10.0(1) 11.3(1) 13.0(1) 16.8 <br />Elevation (ft) 6914.7 6900.5 6882.0 7233.3 6820.0 6873.3 7187.0 7287.0 <br />Diameter -d (in) <br />Emergency Spillway <br />Stage (ft) <br />11.7(1) <br />15.5(1) <br />14.0(1) <br />13.3(1) <br />10.0(1) <br />11.3(1) <br />13.0(1) <br />16.8 <br />? Elevation (ft) <br />6914.7 <br />6900.5 <br />6882.0 <br />7233.3 <br />6820.0 <br />6873.3 <br />7187.0 <br />7287.0 <br />c Width -b (ft) <br />5.9 <br />10.0 <br />9.0 <br />0.5 <br />0.5 <br />0.5 <br />0.0 <br />d <br />Maximum W.S. <br />6916.4 <br />6904.1 <br />6886.0 <br />7236.5 <br />6821.8 <br />6875.0 <br />7187.3 <br />7288.9 <br />Elevation (ft) <br />25 -Yr, 24 -Hr Event <br />Top of Embankment <br />6918.5 <br />6906.3 <br />6888.0 <br />7237.5 <br />6824.0 <br />6876.4 <br />7189.0 <br />7290.0 <br />Elevation (ft) <br />Freeboard (ft) <br />2.1 <br />2.2 <br />2.0 <br />1.0 <br />2.2 <br />1.4 <br />1.7 <br />1.1 <br />Note: Elevations are based on current topographic <br />information obtained from aerial photographs. <br />Actual elevations will vary according to actual field <br />conditions after topsoil removal but relative elevations should remain the same. <br />(1) Single open -channel design. <br />(2) As -built information. <br />(3) West Horse is a mostly incised structure with a small (3 ft.) embankment <br />..c -qb (4) The Deal Gulch embankment is 6.0 feet tall as measured from the upstream toe. The remainder of the capacity comes from the incised portion <br />page revised August 8, 2006, Deal Gulch As -built <br />_ IMPRO5]T48J] <br />