My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-13_GENERAL DOCUMENTS - C1981013
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981013
>
2016-09-13_GENERAL DOCUMENTS - C1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2016 9:16:12 AM
Creation date
9/14/2016 8:52:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
9/13/2016
Doc Name
Legal Document
From
New Elk Coal Company, LLC
To
DRMS
Permit Index Doc Type
Permit Legal Document
Email Name
DIH
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
significant environmental harm to the health or safety of the public; and, <br />b. Utilizing any methods specified in the permit by the Division in approving alternative <br />methods of compliance with the Act and in accordance with the provisions of <br />2.07.6(2)(m) and Rule 4. <br />5. The operator shall pay all reclamation fees required by 30 CFR, Chapter VII, Subchapter <br />R(1989), for coal produced under the permit for sale, transfer or use, in the manner required <br />by that Subchapter. <br />6. Within thirty days after a cessation order is issued under 5.03.2(1), for operations conducted <br />under the permit, except where a stay of the cessation order is granted and remains in effect, <br />the permittee shall either submit to the Division the following information, current to the date <br />the cessation order was issued, or notify the Division in writing that there has been no change <br />since the immediately preceding submittal of such information: <br />a. Any new information needed to correct or update the information previously <br />submitted to the Division by the permittee under 2.03.4(3); or <br />b. If not previously submitted, the information required from a permit applicant by <br />2.03.4(3). <br />7. The permittee shall conduct surface coal mining and reclamation operations only on those <br />lands that are specifically designated as the permit area on the maps and in the legal <br />description submitted with the application. Areas disturbed and affected by surface coal <br />mining and reclamation operations shall be contained within the boundaries authorized on <br />permit application maps for the term of this permit and shall be limited to those areas subject <br />to the performance bond in effect pursuant to these rules. <br />The permittee shall conduct all surface coal mining and reclamation operations only as <br />described in the approved application, except as otherwise directed by the Division in this <br />permit. <br />9. The permittee shall comply with the terms and conditions of this permit, all applicable <br />performance standards of the Act, and the requirements of these Rules. <br />10. Continuous, uninterrupted bond coverage shall be in effect at all times, and an adequate bond <br />amount shall be maintained pursuant to the requirements of Rule 3.02.2. Operating without a <br />bond is a violation of a condition upon which this permit is issued. <br />11. If analyses of the mining and reclamation operation and the data collected through <br />monitoring and experimentation by the operator or monitoring by the Division indicate in the <br />judgment of the Division that the operation will not be able to comply with the requirements <br />of the Act and lawful rules and regulations thereunder, operator hereby agrees to exercise its <br />best efforts, after consulting with the Division, to modify the plans prospectively to correct <br />
The URL can be used to link to this page
Your browser does not support the video tag.