My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-13_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-09-13_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 1:54:09 PM
Creation date
9/13/2016 1:48:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/13/2016
Doc Name
Issuance Letter
From
DRMS
To
Tri-State Generation and Transmission Association
Type & Sequence
PR4
Email Name
rdz
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />If you have any questions, please contact me. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Robert D. Zuber, P.E. <br />Environmental Protection Specialist <br />Rob.zuber@state.co.us <br /> <br />cc: Alan Boehms, Office of Surface Mining <br /> <br />C-PR-19 <br /> <br /> <br />Stipulations <br /> <br />18 - COLOWYO COAL COMPANY WILL CONSTRUCT A GROUNDWATER MONITORING <br />WELL COMPLETED IN THE TROUT CREEK SANDSTONE. FOLLOWING COMPLETION OF THE <br />WORK, A MINOR REVISION WILL BE SUBMITTED TO UPDATE THE PERMIT APPLICATION <br />PACKAGE WITH A COMPLETE DESCRIPTION OF THE WELL, AND TO UPDATE TABLES <br />2.04.7-38, -39, -40 AND -41, AND MAPS 10B AND 11C. THE REVISION WILL BE SUBMITTED NO <br />MORE THAN 90 DAYS AFTER WELL COMPLETION. THESE ACTIONS MUST BE COMPLETED <br />BEFORE ANY DISTURBANCE ASSOCIATED WITH THE COLLOM PIT BOX CUT IS ALLOWED <br />TO OCCUR. <br /> <br />19 - DEWATERING WELL PERMITS MUST BE IN PLACE, AND A MINOR REVISION BE <br />SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 OF VOLUME 1 <br />OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY DISTURBANCE ASSOCIATED WITH <br />THE COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br /> <br />20 - A DISCHARGE PERMIT FOR WATER PUMPED FROM THE DEWATERING WELLS MUST <br />BE IN PLACE, AND A MINOR REVISION TO THE PERMIT SUBMITTED AND APPROVED BY <br />THE DIVISION TO UPDATE SECTION 2.03.10 OF VOLUME 1 OF THE PERMIT APPLICATION <br />PACKAGE, BEFORE ANY DISTURBANCE ASSOCIATED WITH THE COLLOM PIT BOX CUT IS <br />ALLOWED TO OCCUR. <br /> <br />21 - COLOWYO COAL COMPANY WILL CONSTRUCT GROUNDWATER POINT OF <br />COMPLIANCE MLC-04-02, AND CARRY OUT STANDARD WELL TESTS TO ESTIMATE <br />AQUIFER PROPERTIES. FOLLOWING COMPLETION OF THE WORK A MINOR REVISION WILL <br />BE SUBMITTED TO UPDATE THE PERMIT APPLICATION PACKAGE WITH A COMPLETE <br />DESCRIPTION OF THE WELL, AND TO UPDATE TABLES 2.04.7-38, -39, -40 AND -42. MAPS 10B <br />AND 11C SHOULD ALSO BE UPDATED. THESE ACTIONS SHOULD BE COMPLETED BEFORE <br />THE END OF CALENDAR YEAR 2016. <br /> <br />22 - CONDUCT ADDITIONAL BASELINE ASSESSMENTS OF ALL SITES ELIGIBLE TO BE <br />NATIONAL REGISTER OF HISTORIC PLACES AND “NEED DATA” SITES WITHIN THE <br />PROPOSED COLLOM PERMIT EXPANSION AREA BOUNDARY. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.